My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Economic Development Authority - 07/13/2023
Ramsey
>
Public
>
Minutes
>
Economic Development Authority
>
2023
>
Minutes - Economic Development Authority - 07/13/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 2:07:08 PM
Creation date
8/29/2023 9:44:20 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Economic Development Authority
Document Date
07/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
presented the concept for this property with 130 attached townhomes, noting that they feel that the <br />attached product would be ideal for this site and within the COR. She also reviewed the proposed <br />amenities within the development and proposed townhome design. She stated that the proposed <br />price point would be $300,000 to $335,000 for three -bathroom, three -bedroom units. She <br />commented that they would be happy to introduce this new product line in Ramsey, just as they <br />did with their liberty home model. She commented that the neighborhood would be professionally <br />managed by a townhome association. She provided details on the proposed schedule, noting that <br />they would ideally break ground in March or April of next year and build in multiple phases. <br />Steve Bona, Capstone Homes, commented they are happy to be looking at another project in <br />Ramsey. He commented that it is hard to find a location for attached townhomes in the metro area <br />because of the need for close by conveniences. He stated that the COR would provide the <br />accessibility and walkability that is needed for attached townhomes. He stated that they are <br />focusing on price point as well, noting that they cannot hit this price point in Riverstone. He stated <br />that the market is thirsty for this price point and believes there is a huge demand for this. He <br />commented that they feel that the backyards and greenspace are important for buyers, as the target <br />market is young professionals and young families. He stated that they want to have their <br />landscaped entrance and greenspace for people to see when they drive into the development as that <br />will increase marketability. He invited the members of the EDA to attend the Homes for Hope <br />event at Riverstone South later this morning as well. <br />Economic Development Manager Sullivan commented that there are some differences between <br />the proposals. He stated that the backyard units do not have a sidewalk which is not compliant <br />with COR standards and therefore Capstone would request an R-2 zoning. He stated that in order <br />to hit the affordability price point, Capstone is asking for a reduction in park dedication fees. He <br />commented that Capstone would have an attached product while Centra will be presenting a <br />detached product. <br />Mr. Bona commented that Capstone feels that the reduction in park dedication is necessary, noting <br />that the Ramsey park dedication fees have significantly increased over the past few years. He <br />stated that Ramsey has higher fees than the other communities that Capstone builds within. He <br />noted that the price for park dedication would equate to $6,000 per unit and while they can afford <br />that within Riverstone, they could not provide the proposed price point for the townhomes with <br />that level of park dedication. <br />David Pattberg, Centra Homes, stated he appreciated the work of staff throughout this process. He <br />provided background information on Centra Homes, a local builder focused on the north metro. <br />He displayed the proposed product for the Centra concept that would that would be a similar <br />product to what they have already built in the COR. He stated that this would provide sidewalks <br />and trails to continue the connectivity of the COR. He commented that the trails and connections <br />within the COR are heavily used. He stated that for this product they have seen singles, young <br />families, and empty nesters. He stated that the 16-acre concept would reserve the remainder of the <br />site for commercial use and if that were not to come forward, they could continue the residential <br />development onto that remainder. He provided some of the example floorplans and elevations. <br />He commented that their existing neighborhood is fully built out within the COR and fully <br />occupied. He stated that staff has done a great job providing a comparison of the projects within <br />Economic Development Authority/ July 13, 2023 <br />Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.