Laserfiche WebLink
PERSONNEL COMPLEMENT - <br />Public Works Superintendent <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Secretary (Formerly under Engineering) <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Mechanic <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />3.00 <br />Street Supervisor <br />- <br />- <br />- <br />1.00 <br />1.00 <br />1.00 <br />Streets Lead Worker <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />PW Maintenance Worker <br />5.00 <br />5.00 <br />5.00 <br />5.00 <br />5.00 <br />8.00 <br />Temporary - Streets <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />Street Maintenance Total <br />10.50 <br />10.50 <br />10.50 <br />11.50 <br />11.50 <br />14.50 <br />6488/6489 Other Contracted Services <br />Pavement Management Program Funding (Transfer to Pavement Management Fund) <br />260,742 <br />300,000 <br />- <br />- <br />- <br />Contract services for Pothole patching <br />Cracksealing/Rejuvenation/Spray Patching <br />237,483 <br />239,258 <br />162,784 <br />200,000 <br />200,000 <br />200,000 <br />Spray Patching <br />- <br />- <br />- <br />- <br />375,000 <br />355.1000 <br />Curb Repair/Tree Removal <br />- <br />-- <br />15,000 <br />15,000 <br />20,000 <br />237,483 <br />500,000 <br />462,784 <br />215,000 <br />590,000 <br />575,000 <br />6540 - Heavy Machinery <br />F350 truck with plow (2021 & 2022 total cost) <br />- <br />- <br />116,891 <br />103,199 <br />1--Ton Truck <br />_ <br />2-Single Axis Plow Trucks <br />148,292 <br />- <br />- <br />544,318 <br />Tractor Backhoe ($84,000 total remainder utility funded) <br />37,688 <br />Tandem Axle Truck with Plow <br />- <br />- <br />- <br />298,750 <br />721 G Front End Loader <br />226,000 <br />185,980 <br />- <br />116,891 <br />103,199 <br />298,750 <br />770,318 <br />6550-Motor Vehicle <br />1--ton truck <br />- <br />62,772 <br />2-3/4 ton trucks with plows (1 new & 1 replacement) <br />- <br />- <br />- <br />- <br />133,852 <br />F550 44 Truck with 9' 2" V-plow (New) with lift gate <br />109,000 <br />F350 4x4 with utility box and 9' 2°-Boss V-Plow Sign truck <br />- <br />_ <br />- <br />62,772 <br />- <br />133,852 <br />109,000 <br />6580 - Other Equipment <br />Sidewalk Machine <br />- <br />- <br />162,723 <br />Snow Pusher Box for Front End Loader <br />18,855 <br />Trailer for skidsteer <br />- <br />- <br />15,102 <br />Toolcat <br />36,105 <br />Skidsteer <br />- <br />- <br />57,372 <br />Tire balancer (1/2 cost other 1/2 police) <br />9,453 <br />Asphalt floater <br />14,405 <br />ATV Athletic Field Maintenance Machine <br />14,032 <br />- <br />Hydraulic hose Crimping Machine <br />Trailer Mounted Boom Lift <br />58,000 <br />Bobcat T66 Skidsteer <br />811000 <br />Scissor Lift JLG 2646 <br />26,500 <br />10-Foot Slide in Removable Salt/Sander Spreader (Truck Mounted) <br />14,000 <br />Hydraulic hose Crimping Machine <br />1 1; nary <br />14,032 - 271,302 23018S8 18,855 194,500 <br />DESCRIPTION OF SERVICES: <br />The Street Maintenance Department is responsible for maintaining city streets, sidewalks, traffic signs, <br />boulevards, ROW mowing and the storm water collection system. <br />BUDGET HIGHLIGHTS <br />• Street Maintenance Worker - New lull Time - Start 2-5-24-$66,125) (6102-61.33) <br />• Street Maintenance Worker - New Full Time - Start 2-5-24-$66,125) (6102-6133) <br />• Street Maintenance Worker - New Full Time - Start 3-4-24-$60,219 (6102-6133) <br />• Mechanic - New Full Time - Start 3-4-24-$65,420 (6102--6133) <br />+ PIN Building Repairs (1/3 share) - $21,670 (6381) <br />• Contract Services Pothole Patching - $500,000 (6488-6489) <br />+ Spray Patching - ARPA funds of $375,000 spent in 2023 (6488-6489) <br />+ 2-Single Axle Plow Trucks (CC Authorized 1-24-23) -- $544,318 <br />• Additional Capital Requests (See listing above) - $529,500 (6540-6580) (Capital Equip Debt) <br />-49- <br />