My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/12/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 09/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:25:55 AM
Creation date
9/13/2023 10:57:01 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/12/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Contract No.: 1052605 <br />1.4. Plans, Specifications, and Special Provisions. State -approved County plans, specifications, and special <br />provisions designated by the County as SP 002-596-026 and by the City and the State as SP 0202-116 <br />(TH 10=003) are on file in the office of the County's Engineer and incorporated into this Agreement by <br />reference (Project Plans). <br />1.5. Duties of the County. The County will perform all of its duties and obligations in MnDOT Contract 1052131, <br />which is incorporated herein by reference, in the solicitation, letting, award, and administration of the <br />construction of the Project. <br />1.6. Exhibits. Preliminary Schedule "I" is attached and incorporated into this Agreement. Exhibit A — Signing <br />Ownership and Maintenance, Exhibit 6—Drainage Ownership and Maintenance, Exhibit C — Wall <br />Maintenance, and Exhibit D — Lighting Maintenance are on file in the office of the State's Cooperative <br />Agreements Engineer at Saint Paul and incorporated into this Agreement by reference. <br />2. Right -of -Way Use <br />2.1. Limited Right to Occupy. The State grants to the County and the City (and their contractors and <br />consultants) the right to occupy Trunk Highway Right -of -Way as necessary to perform the work described <br />in the Project Plans. This right is limited to the purpose of constructing the Project and administering such <br />construction and may be revoked by the State at any time, with or without cause. Cause for revoking this <br />right of occupancy includes, but is not limited to, breaching the terms of this or any other agreement <br />(relevant to this Project) with the State, failing to provide adequate traffic control or other safety <br />measures, failing to perform the construction properly and in a timely manner, and failing to observe <br />applicable environmental laws or terms of applicable permits. The State will have no liability to the County <br />or the City (or their contractors or consultants) for revoking this right of occupancy. <br />2.2. State Access; Suspension of Work; Remedial Measures. The State's District Engineer or assigned <br />representative retains the right to enter and inspect the Trunk Highway Right -of -Way (including the <br />construction being performed on such right-of-way) at any time and without notice to the County or the <br />City or their contractors. If the State determines (in its sole discretion) that the construction is not being <br />performed in a proper or timely manner, or that environmental laws (or the terms of permits) are not <br />being complied with, or that traffic control or other necessary safety measures are not being properly <br />implemented, then the State may notify and require the County and the City (and their contractors and <br />consultants) to suspend their operations until the County and the City (and their contractors and <br />consultants) take all necessary actions to rectify the situation to the satisfaction of the State. The State will <br />have no liability to the County or the City (or their contractors or consultants) for exercising or failing to <br />exercise its rights under this provision. <br />2.3. Traffic Control; Worker Safety. While the County and the City (and their contractors and consultants) are <br />occupying the State's Right -of -Way, they must comply with the approved traffic control plan, and with <br />applicable provisions of the Work Zone Field Handbook <br />(http://www.dot.state.mn.us/trafficeng/workzone/index.html). All County, City, contractor, and consultant <br />personnel occupying the State's Right -of -Way must be provided with required reflective clothing and hats. <br />2.4. State Ownership of Improvements. The State will retain ownership of its Trunk Highway Right -of -Way, <br />including any improvements made to such right-of-way under this Agreement, unless otherwise noted. <br />The warranties and guarantees made by the County's contractor with respect to such improvements (if <br />any) will flow to the State. The County will assist the State, as necessary, to enforce such warranties and <br />guarantees, and to obtain recovery from the County's consultants and contractor (including its sureties) for <br />non-performance of contract work, for design errors and omissions, and for defects in materials and <br />workmanship. Upon request of the State, the County will undertake such actions as are reasonably <br />necessary to transfer or assign contract rights to the State and to permit subrogation by the State with <br />respect to claims against the County's consultants and contractors. <br />-3- <br />Payable Standard <br />
The URL can be used to link to this page
Your browser does not support the video tag.