MnDOT Contract No.: 1052605
<br />construction. Before payment by the State, the County will furnish the State with certified copies of the
<br />documents for rights -of -way and easements, construction permits, and other permits and sanctions
<br />required for State participation construction covered under this Agreement.
<br />4.2. The County will convey to the State by quit claim deed all newly acquired rights needed for the continuing
<br />operation and maintenance of the Trunk Highway, if any, upon completion of the Project at no cost or
<br />expense to the State.
<br />4.3. The County will comply with Minnesota Statutes § 216D.04, subdivision 1(a), for identification, notification,
<br />design meetings, and depiction of utilities affected by the contract construction.
<br />4.4. The City will submit to the State's Utility Engineer an original permit application for all utilities owned by
<br />the City to be constructed upon and within the Trunk Highway Right -of -Way. Applications for permits will
<br />be made on State form "Application for Utility Permit on Trunk Highway Right -of -Way" (Form 2525).
<br />4.5. The City will submit to the Minnesota Pollution Control Agency the plans and specifications for the
<br />construction or reconstruction of its sanitary sewer facilities to be performed under the construction
<br />contract and obtain, under Minnesota Statutes § 115.07 or Minnesota Rules 7001.1030, subpart 2C, either
<br />a permit or written waiver from that agency for that construction or reconstruction. The City is advised
<br />that under Minnesota Rules 7001.1040, a written application for the permit or waiver must be submitted
<br />to the Minnesota Pollution Control Agency at least 180 days before the planned date of the sanitary sewer
<br />facility construction or reconstruction.
<br />4.6. The City will obtain, through the District's Right -of -Way Area Manager, a Limited Use Permit (LUP),
<br />currently LUP 0202-0108, to cover the City's liability responsibilities of trails to be constructed upon the
<br />State's Right -of -Way.
<br />5. Maintenance by the City
<br />Upon completion of the Project, the City will provide the following without cost or expense to the State:
<br />5.1. Roadways. Maintenance of the NW Frontage Road, North Frontage Road, NE Frontage Road, and
<br />Riverdale Drive. Maintenance includes, but is not limited to, snow, ice and debris removal, resurfacing, seal
<br />coating, and any other maintenance activities according to accepted City maintenance practices.
<br />5.2. Storm Sewers. Routine maintenance of storm sewer facilities construction as shown on Exhibit B —
<br />Drainage Ownership and Maintenance. Routine maintenance includes, but is not limited to, removal of
<br />sediment, debris, vegetation, and ice from grates and catch basins, and any other maintenance activities
<br />necessary to preserve the facilities and to prevent conditions such as flooding, erosion, or sedimentation,
<br />this also includes informing the District Maintenance Engineer of any needed repairs.
<br />5.3. Stormwater Basin Responsibilities
<br />A. Old Holiday Stormwater Basin
<br />The City will share the maintenance responsibilities of the Old Holiday stormwater basin. Maintenance
<br />will include, but not be limited to, litter, debris and silt removal, mowing, erosion repairs, and any other
<br />maintenance activities necessary to preserve the facilities and to prevent conditions such as flooding,
<br />erosion, sedimentation, or accelerated deterioration of the facilities. The City will be responsible, to the
<br />extent provided by law, for its own acts and omissions in connection with maintaining the stormwater
<br />basin.
<br />The State will share in the cost of future major maintenance at a rate based on the ratio of contributing
<br />water volume entering into the basin at the time that the major maintenance is required. The State's
<br />contributing water volume entering into the basin at the time is was designed is 26 percent. Major
<br />maintenance includes, but is not limited to, removal of sediment, repair of major erosion problems,
<br />In
<br />Payable Standard