Laserfiche WebLink
Indirect (18 %) $ 275898 <br />Total Project $182,888 a say $183,000 <br />A MnDOT right of way permit would be required to construct this project. <br />A LRRWMO permit would also likely be required since work will likely be required in close proximity to Ford <br />Brook. <br />Permission from the City of Nowthen would also be required to construct this project. <br />Staff have visited the site numerous times since 2018 when Improvement Project # 19-01 was first being scoped. <br />Staff have taken numerous pictures of the streets, drainage ditches, driveways, culverts and abutting properties. <br />Staff will share some of these pictures during the meeting. <br />The property owners have also taken and shared many pictures and videos with Staff, some of which will also be <br />shared during Staff s presentation. <br />Drainage generally runs north to south, towards 180th Lane NW, across the property. Attached is a figure <br />showing 2023 aerial photography with 2-foot contours. <br />Attached is a figure that shows the proposed storm sewer system outlined in option 2. <br />Notification: <br />N/A <br />Time Frame/Observations/Alternatives: <br />Timeframe: <br />Staff anticipates up to 45 minutes will be required to present this case and respond to questions. <br />Observations/Alternatives: <br />The property owners received notice of this meeting and a link to the Public Works agenda, including this case, <br />and are planning to attend the meeting in person. <br />Funding Source: <br />Dependent on discussions and direction from the Public Works Committee. <br />Recommendation: <br />Staff has no recommendations to offer at this time. <br />Outcome/Action: <br />Dependent on discussions and direction from the Public Works Committee. <br />Option 2 Project Layout <br />2023 Aerial w 2' Contours <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Hagen Brian Hagen 09/14/2023 03:20 PM <br />