Laserfiche WebLink
City of Anoka Improvement Projects <br />• Highway 47 Corridor Improvements <br />• 3-lane design proposed south of Bunker Lake Boulevard <br />• City received regional solicitation funds for 2027 construction <br />• Signal system at McKinley Street is proposed to be permanent <br />• Anoka webpage https:Hclients.bolton-menk.com/anokahwy47/ <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />• Construction substantially complete <br />• Construction complete Fall 2023 <br />MnDOT Improvement Projects <br />. Anoka Solution Highway 10 Improvements <br />. Substantial completion November 2023 <br />. Final completion Spring 2024 <br />. Anoka webpage hops://clients.bolton-menk.com/hwy10/ <br />. MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />. US 10 / 169 &Ferry Street / TH 47 Interchange <br />. Final completion Spring 2024 <br />. MnDOT webpage http://www.dot.state.mn.us/metro/protects/hwy10-anoka/ <br />. Ferry Street /Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />• Preliminary design suspended; exploring S-curve realignment and stormwater impacts <br />• $45M in bonds authorized October 2020 <br />• Construction proposed for 2024 or later <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy47rr-anoka/ <br />• Rum River Bridge Replacement <br />Three lanes each direction <br />• Final completion Spring 2024 <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />Studies & Items of Interest <br />. Pothole Patching Updates <br />. Staff will summarize pothole patching work completed to date and plans to prepare for next spring <br />. Sunfish Lake Sedimentation Basin Improvements <br />. Property owner indicated interest in filling Swale and grading sedimentation basin <br />. Staff delineated rear property line last Fall and notified property owner <br />. Staff continues to try contacting property owner <br />. Elk River Highway 10 Corridor Study <br />. Staff will present final report when available (October 2023?) <br />. Study website hops://www.highwavl0corridorstudv.com/ <br />Notification: <br />N/A <br />Time Frame/Observations/Alternatives: <br />Staff estimates up to 10 minutes will be needed for updates and discussion. <br />Funding Source: <br />N/A <br />