My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/19/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 09/19/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:44:15 AM
Creation date
9/21/2023 9:27:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Anoka Improvement Projects <br />• Highway 47 Corridor Improvements <br />• 3-lane design proposed south of Bunker Lake Boulevard <br />• City received regional solicitation funds for 2027 construction <br />• Signal system at McKinley Street is proposed to be permanent <br />• Anoka webpage https:Hclients.bolton-menk.com/anokahwy47/ <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />• Construction substantially complete <br />• Construction complete Fall 2023 <br />MnDOT Improvement Projects <br />. Anoka Solution Highway 10 Improvements <br />. Substantial completion November 2023 <br />. Final completion Spring 2024 <br />. Anoka webpage hops://clients.bolton-menk.com/hwy10/ <br />. MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />. US 10 / 169 &Ferry Street / TH 47 Interchange <br />. Final completion Spring 2024 <br />. MnDOT webpage http://www.dot.state.mn.us/metro/protects/hwy10-anoka/ <br />. Ferry Street /Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />• Preliminary design suspended; exploring S-curve realignment and stormwater impacts <br />• $45M in bonds authorized October 2020 <br />• Construction proposed for 2024 or later <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy47rr-anoka/ <br />• Rum River Bridge Replacement <br />Three lanes each direction <br />• Final completion Spring 2024 <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />Studies & Items of Interest <br />. Pothole Patching Updates <br />. Staff will summarize pothole patching work completed to date and plans to prepare for next spring <br />. Sunfish Lake Sedimentation Basin Improvements <br />. Property owner indicated interest in filling Swale and grading sedimentation basin <br />. Staff delineated rear property line last Fall and notified property owner <br />. Staff continues to try contacting property owner <br />. Elk River Highway 10 Corridor Study <br />. Staff will present final report when available (October 2023?) <br />. Study website hops://www.highwavl0corridorstudv.com/ <br />Notification: <br />N/A <br />Time Frame/Observations/Alternatives: <br />Staff estimates up to 10 minutes will be needed for updates and discussion. <br />Funding Source: <br />N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.