Laserfiche WebLink
10. Storm Water Regional Basin Contribution. In lieu of constructing on -site storm water <br />management basins, ALDI shall contribute an equal amount as the cost of constructing on -site <br />basins to the CITY for use of the regional storm water basin in the amount of $23,220.00. <br />11. Storm Water Management Fee. ALDI is responsible for satisfying applicable Storm Water <br />Management Fee requirements for the plat of COR FOUR. ALDI must pay a Storm Water <br />Management Fee of $7,715.00 (1.45 acres x $5,321.00 per acre). ALDI acknowledges that these <br />fees are estimates. The rate in effect when the Plat is recorded will be collected. <br />12. Park Dedication. ALDI is responsible for satisfying applicable Park Dedication requirements with <br />the plat of COR FOUR. ALDI must pay $7,395.00 (park dedication) and $1,885.00 (trail <br />development). These amounts are based off 1.45 acres at $5,100 per acre (park dedication) and <br />$1,300 per acre (trail development). <br />13. Sanitary Sewer Connection (Trunk) Fees. ALDI is responsible for satisfying applicable Sanitary <br />Sewer Trunk Fee requirements for the plat of COR COUR. ALDI must pay a Sanitary Sewer Trunk <br />Fee of $5,891.00 (1.45 acres x $4,063.00 per acre). ALDI acknowledges that these fees are <br />estimates. The rate in effect when the Plat is recorded will be collected. <br />14. Water Connection (Trunk) Fees. ALDI is responsible for satisfying applicable Water Trunk Fee <br />requirements with the plat of COR FOUR. ALDI must pay a Water Trunk Fee of $10,647.00 1.45 <br />acres x $7,343.00 per acre). ALDI acknowledges that these fees are estimates. The rate in effect <br />when the Plat is recorded will be collected. <br />SECTION II <br />PERMITS AND OCCUPANCY <br />15. Requirements for Building Permit. <br />a. No building permit shall be issued until ALDI has: (a) provided the CITY Building Official <br />with a Certificate of Survey; (b) the Financial Guaranty described in Section I Paragraph 8 to <br />the CITY; and (c) obtained all necessary permits from the Lower Rum River Watershed <br />Management Organization and has provided a copy of such permit to the CITY, if applicable; <br />and <br />b. No occupancy permit shall be issued until ALDI has: (a) constructed vehicular access to the <br />Subject Property, including the installation of at least one layer of bituminous surfacing; and <br />(b) constructed all utilities and storm water facilities this Agreement requires to serve the <br />Subject Property and such utilities and storm water facilities are in place, operational and <br />accepted by the CITY as provided herein. <br />SECTION III <br />ON -SITE LANDSCAPING <br />16. Maintenance Guaranty for Landscaping. It is herein agreed that ALDI shall provide a <br />maintenance guaranty to ensure the survival of the plantings that are a part of the Required <br />Improvements. Said maintenance guaranty shall consist of cash or an irrevocable letter of credit, <br />reasonably approved as to form by the CITY, in the amount of $6,300.00 [#plantings (28 trees and <br />168 shrubs) xcost/planting ($300/tree and $75/shrub) x 30% average non -survival rate], which <br />shall be in effect for a two (2) year period commencing on the date of the CITY's written acceptance <br />of said plantings as part of the Required Improvements. <br />Aldi <br />Development Agreement <br />Page 4 of 9 <br />