My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/26/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 09/26/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:27:09 AM
Creation date
9/27/2023 11:59:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/26/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Site Inspection Fees. The PERMITTEE shall be responsible for all site inspection costs incurred <br />by the CITY related to the installation of Required Improvements. The PERMITTEE shall <br />make a cash deposit into the appropriate escrow account at the CITY and the CITY shall have the <br />authority to draw upon these funds for the purpose of compensating for inspection services. The <br />amount of the deposit shall be equal to five percent (5%) of the estimated cost of the Required <br />Improvements, which equates to Thirty -One Thousand Seventy -Eight Dollars and No Cents <br />($31,078.00) (5% x $621,555.00). Upon completion of the Required Improvements to the <br />satisfaction of the CITY, any surplus balance remaining in the CITY's escrow account shall be <br />refunded to the PERMITTEE. <br />11. Storm Water Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Storm Water Management Fee requirements for the Subject Property. PERMITTEE must pay a <br />Storm Water Management Fee of $22,029.00 (4.14 acres x $5,321.00 per acre). <br />12. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements for the Subject Property. PERMITTEE must <br />pay a Sanitary Sewer Trunk Fee of $16,821.00 (4.14 acres x $4,063.00 per acre). <br />13. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable <br />Water Trunk Fee requirements with the Subject Property. PERMITTEE must pay a Water Trunk <br />Fee of $30,400.00 (4.14 acres x $7,343.00 per acre). <br />14. Cost Share for Limonite Street NW Improvements. The PERMITTEE and the CITY have <br />agreed to pay for the improvements to Limonite Street NW j ointly. Public utility extensions from <br />the north to the connection points with the service lines shall be paid completely by the <br />PERMITTEE. The CITY will pay for the continuation of the Sanitary Sewer and Water Main <br />to 142nd Avenue NW. Costs associated with the roadway, including the Storm Sewer, shall be <br />split equally between the PERMITTEE and the CITY. <br />The PERMITTEE's engineer's estimates (totals) for the street and utility work are as follows: <br />PERMITTEE <br />CITY <br />Total <br />Sanitary Sewer and <br />$ 3 9(47.72%)Water <br />$43,230 <br />$82,694 <br />Main�464 <br />Street and Storm <br />$77(50%)Sewer�894 <br />$77,894 <br />$155,788 <br />The PERMITTEE shall present the City Engineer detailed invoices for the work that has been <br />completed for review and payment according to the amounts shown in the estimate. In the event <br />the actual costs differ from the estimates, the cost split shall be based on the percentages shown in <br />the table above. <br />SECTION II <br />PERMITS AND OCCUPANCY <br />15. Requirements for Building Permit. <br />a. No building permit shall be issued until the PERMITTEE has: (a) installed a Class 5 driving <br />surface to within 300 feet of the structure for access and public safety purposes; (b) provided <br />NOLBY BC LLC (Jam Hops) <br />Development Agreement <br />Page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.