My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/26/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 09/26/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:27:09 AM
Creation date
9/27/2023 11:59:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/26/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Based on the Existing Year (2023) capacity analysis, the study intersections are anticipated to operate at <br />LOS B or better in the morning and C or better at the evening peak hour. The SimTraffic reports are provided <br />in Appendix D. All 95t" percentile queues are anticipated to remain within their respective storage bays. All <br />individual movements are anticipated to operate at LOS D or better, except for the following: <br />During the morning peak hours, the northbound through movement of MN-47 operates at LOS E. This is <br />likely due to the signal timing favoring the southbound through/left movement which sees around four times <br />as much traffic at this time. At the same intersection, the westbound left and through movements are also <br />operating at LOS E in the PM peak hours. Finally, the eastbound left and southbound left intersections <br />operate at LOS E in the Sunday peak, these movements are low volume and are not anticipated to have <br />queuing issues. <br />All movements at stop -controlled intersections operate at LOS D or better except the eastbound left <br />movement at CSAH 5 &Iodine St which operates at LOS E. Queues for the movement are minimal and <br />delays are expected for minor side street movements along a corridor like CSAH 5. <br />OPENING YEAR (2027) NO -BUILD CONDITIONS <br />A capacity analysis was performed for Opening Year (2027) No -Build conditions in order to develop <br />baseline operating conditions for the opening year. The analysis was performed using Synch ro/SimTraffic. <br />The three site accesses were modeled with the existing geometry and intersection control. The four study <br />intersections were also modeled with the existing geometry and intersection control. The traffic volumes <br />are provided in Exhibit 4. The results of the analysis are provided in Table 4. <br />Haviland Fields -Ramsey, MN <br />Traffic Impact Analysis I July 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.