Laserfiche WebLink
Table 9 — Left -Turn Lane Warrants <br />85t" <br />Percent Left in <br />Advancing <br />Left Turn <br />Year of Build <br />Opposing Volume <br />Percentile <br />Advancing <br />Volume <br />Warranted <br />Condition <br />(veh/h) <br />Speed (mph) <br />Volume <br />(veh/h) <br />yes/no? <br />2027 <br />50 <br />1 <br />464 <br />442 <br />No <br />2040 <br />50 <br />1 <br />520 <br />496 <br />No <br />Haviland Fields —Ramsey, MN <br />Traffic Impact Analysis I July 2023 <br />