My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/26/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 09/26/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:27:09 AM
Creation date
9/27/2023 11:59:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/26/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n ES <br />www.ae2s.com <br />September 19, 2023 <br />Bruce Westby <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />Re: Water Treatment Plant — Construction Contingency Expense No. 1 <br />Dear Mr. Westby: <br />AE2S continues to oversee the construction of Ramsey's new WTP. Magney has poured the foundation in <br />the Reservoir and some of the exterior walls and has started to pour foundations in the Water Treatment <br />Plant. Our engineering team has continued to coordinate with Magney and further refine the installation <br />details of other pieces of equipment. Through those investigations we have identified some items that will <br />require adjustments. This letter is intended to outline those adjustments and summarize the current project <br />budget in order for Ramsey to fully understand the status of the project. <br />Basis for of Construction Continency Expenses: <br />Currently 6 requests for pricing (RFP) have been submitted to Magney. A full list of those requests are <br />shown below. To date AE2S has received pricing back on three of the RFP's and we would like to move <br />forward with Construction Contingency Expense No. 1, which will include price RFP 001, 003, and 006. <br />The Contractor has included a request for extension in RFP 001 and RFP 006. More information has been <br />requested before approving the time extensions. If an extension is approved to extend the substantial <br />completion date, that will result in a Change Order issued at a different time. <br />Expense <br />RFP <br />Description <br />Total Cost <br />Extension <br />Required <br />Status <br />No. <br />No. <br />(days) <br />1 <br />001 <br />Mixing Pumps Pipe Upsizing <br />$511287.38 <br />14 <br />Y <br />Pending Expense <br />002 <br />Upsizing Air Exchange in Plate <br />pending <br />Under Review - <br />Settler Room <br />Contractor <br />1 <br />003 <br />Admin Ceiling Grid Color <br />$21609.25 <br />N <br />Pending Expense <br />004 <br />Blower Pipe Upsizing <br />Pending <br />Under Review - <br />Contractor <br />005 <br />Flowable Fill <br />Pending <br />Under Review - <br />Contractor <br />1 <br />006 <br />Storm and Plumbing Updates <br />$221550.28 <br />88 <br />Y <br />Pending Expense <br />Note: Any extension delays will be approved as a separate Change Order and will not be included in this Construction <br />Contingency Expense. <br />RFP No. 001: Mixing Pumps Pipe Upsizing: <br />The Backwash Tank mixing system manufacturer is recommending that the suction and discharge piping <br />on the mixing pump be upsized from the proposed 6" to 14" to meet the required mixing flow rate. This <br />change will not alter the price of the mixing system package that will be supplied by the manufacturer. <br />However, it will require Magney to upsize the pipes and valves from the pump to the tank. <br />Advanced Engineering and Environmental Services, Inc. <br />6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />
The URL can be used to link to this page
Your browser does not support the video tag.