Laserfiche WebLink
N.'Y <br />www,ma9neYconsW ctbn.can <br />CONSTRUCTION Proposal <br />COMMERCIAL b INDUSTRIAL CONTRACTORS <br />1401 Park Road -Chanhassen, MN 55317 <br />952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />From <br />AE2S <br />Kevin Vranicar <br />Attention <br />Date <br />Mr. Ryan Hanson <br />5/16/2023 <br />E-mail Phone <br />Proposal # <br />Ryan. Hanson(ab-ae2s.com (612) 220-0154 <br />001 - Jet Mixing Piping Modifications <br />❑ Urgent Please comment X❑ Please review For your information <br />Total pages, including cover. 9 <br />COMMENTS 1 0 <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Ryan, <br />Magney Construction, Inc. is pleased to present the following quotation to modify and upsize the specified 6- <br />inch piping, fittings, valves, nuts, bolts and gaskets to the required 14-inch piping, fittings, valves, nuts, bolts <br />and gaskets. Treatment Resources is also recommending changing the jet mixing pumps, which comes with <br />a substantial credit. The costs associated with this change are summarized below. <br />Labor: Additional Labor Required for 14" Pipe vs. 6" Pipe $ 97922.50 <br />Material: Additional Costs for 14" vs. 6" Pipe, Fittings, Valves, N,B&G, (incl. tax) $ 547156.60 <br />Equipment: Misc. Small Tools and Equipment (10% of Labor) $ 992.25 <br />Subcontractor: Fresh Blast Painting $ 450.00 <br />Subtotal $ 65, 521.35 <br />General Contractor's Overhead $ 97783.20 <br />Bond & Insurance premiums $ 982.82 <br />Lump Sum Total: $ 763287.38 <br />Proposed Lump Sum Credit: $ (253000.00) <br />Treatment Resources has proposed changing the jet mixing pumps from Warman to Peerless. The <br />horsepower will drop from 50 HP to 25 HP, but will still deliver the design duty points specified and will <br />perform well in this application. Please review the attached Peerless pump cut sheets. <br />Grand Total: $ 513287.38 <br />Additional Working Days Required for this Change (Including material lead time): 114.0 <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />Kevin Vranicar <br />Vice President FAccepted By Date <br />Page 1 of 1 <br />