My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/26/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 09/26/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:27:09 AM
Creation date
9/27/2023 11:59:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/26/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p�NEY <br />www.magneyconstruction.com <br />CONSTRUCTION Proposal <br />COMMERCIAL 6 INDUSTRIAL CONTRACTORS <br />1401 Park Road -Chanhassen, MN 55317 <br />952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />From <br />AE2S <br />Kevin Vranicar <br />Attention <br />Date <br />Mr. Ryan Hanson <br />8/22/2023 <br />E-mail Phone <br />Proposal # <br />Ryan. Hanson(cx-ae2s.com (612) 220-0154 <br />002 - RFP # 003 Acoustical Ceiling Grid Color Modifications <br />F] Urgent F] Please comment Fx-]Please review <br />Total pages, including cover: 3 <br />COMMENTS <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />For your information <br />Ryan, <br />Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, <br />material and/or equipment to modify the specified color (white) of the acoustical celling suspension grid <br />system to either Silver Satin or Chrome, per your 5/22/23 email request. A pricing option has been provided <br />below for each of the two color options. The costs associated with this change are summarized below. <br />Oation 1 - Silver Satin <br />Labor: <br />$ <br />- <br />Material: <br />$ <br />- <br />Equipment: <br />$ <br />- <br />Subcontractor: Twin City Acoustics, Inc. (see attached) -SILVER SATIN <br />$ <br />975.00 <br />Subtotal <br />$ <br />975.00 <br />General Contractor's Overhead <br />$ <br />48.75 <br />Bond &Insurance premiums <br />$ <br />14.63 <br />Lump Sum Total: <br />$ <br />17038.38 <br />Oation 2 - Chrome Grid <br />Labor: $ - <br />Material: $ - <br />Equipment: $ - <br />Subcontractor: Twin City Acoustics, Inc. (see attached) -CHROME GRID $ 2,450.00 <br />Subtotal $ 25450.00 <br />General Contractor's Overhead $ 122.50 <br />Bond &Insurance premiums $ 36.75 <br />Lump Sum Total: $ 27609.25 <br />Additional Working Days Required for this Change (Including material lead time): 0.0 ::1 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.