Laserfiche WebLink
Erickson Electric <br />Material <br />Material <br />Tax 7.625% <br />Material MU 10% <br />Permit <br />Labor <br />PM/Estimator <br />Wireman <br />Overtime 1-1/2 <br />Overtime double time <br />Labor M U 10% <br />Subcontractor <br />Markup @ 5% <br />Subtotal <br />Bond <br />Total cost for this change <br />Rate/h r <br />Hours <br />$170 <br />1 <br />$160 <br />13 <br />$240 <br />0 <br />$320 <br />0 <br />Mat. <br />labor <br />Cost <br />$ 1,171.43 <br />$ 89.32 <br />$ 117.14 <br />$ 170.00 <br />$ 2,080.00 <br />$ 225.00 <br />$ 3)852.89 <br />$ 31852.89 <br />