Laserfiche WebLink
23-18 2023 Additional Pavement Marking Improvements <br />Quote Form <br />Item <br />MnDOT <br />Estimated <br />No. <br />No. <br />Item <br />Unit <br />Quantity Unit Cost Cost Extension <br />1 <br />2021.501 <br />Mobilization <br />LS <br />1 <br />2 <br />2563.601 <br />Traffic Control <br />LS <br />1 <br />4" Double Solid Line —Yellow <br />3 <br />2582.502 <br />(Epoxy) <br />LF <br />51069 <br />4 <br />2582.502 <br />4" Solid Line —Yellow (Epoxy) <br />LF <br />733 <br />5 <br />2582.502 <br />4" Solid Line —White (Epoxy) <br />LF <br />18,830 <br />6 <br />2582.502 <br />4" Broken Line —Yellow (Epoxy) <br />LF <br />900 <br />7 <br />2582.502 <br />24" Solid Line —Yellow (Epoxy) <br />LF <br />20 <br />8 <br />2582.502 <br />24" Solid Line —White (Epoxy) <br />LF <br />135 <br />9 <br />2582.518 <br />Crosswalk Markings (Epoxy) <br />SF <br />21592 <br />10 <br />2582.602 <br />Pavt Mssg —Turn Arrows (Epoxy) <br />EA <br />11 <br />11 <br />2582.602 <br />Pavt Mssg —Only (Epoxy) <br />EA <br />3 <br />12 <br />2582.602 <br />Pavt Mssg —Yield (Epoxy) <br />EA <br />4 <br />Total Quote (Items 1-12) <br />