MnDOT Contract No.: 1052605
<br />5.5. Trails. Maintenance of any trail construction. Maintenance includes, but is not limited to, snow and ice
<br />control/removal, sweeping and debris removal, patching, crack repair, pavement replacement, vegetation
<br />control, signing, pavement markings, and any other maintenance activities necessary to perpetuate the
<br />trails in a safe and usable condition. The LUP, currently LUP 0202-0108, will address additional
<br />maintenance and liability responsibilities for the nonmotorized trail.
<br />5.6. Retaining Walls. Maintenance of retaining wall construction as shown on ExhibitC — Wall Maintenance.
<br />Maintenance includes graffiti removal and any other maintenance activities necessary to perpetuate the
<br />walls in a safe, usable, and aesthetically acceptable condition.
<br />5.7. Noise Walls. Maintenance of the non -highway side of noise wall construction as shown on Exhibit C — Wall
<br />Maintenance. Maintenance includes vegetation control, graffiti removal on the non -highway side, and any
<br />other maintenance activities necessary to perpetuate the walls in a safe, usable, and aesthetically
<br />acceptable condition.
<br />5.8. Signing. Exhibit A — Signing Ownership and Maintenance shows the signs that will be maintained by the
<br />City according to City maintenance practices.
<br />5.9. Lighting. Maintenance and ownership of lighting facilities construction as shown on Exhibit D — Lighting
<br />Maintenance. Maintenance of electrical lighting systems includes everything within the system, from the
<br />point of attachment to the power source or utility, to the last light on the feed point, including but not
<br />limited to re-lamping of lighting units or replacing of LED luminaires, repair or replacement of all damaged
<br />luminaire glassware, loose connections, luminaires when damaged or when ballasts fail, photoelectric
<br />control on luminaires, defective starter boards or drivers, damaged fuse holders, blown fuses, knocked
<br />down poles including wiring within the poles, damaged poles, pull boxes, underground wire, damaged
<br />foundations, equipment pad, installation of approved splices or replacement of wires, repair or extending
<br />of conduit, lighting cabinet maintenance including photoelectric cell, electrical distribution system, Gopher
<br />State One Call (GSOC) locates, and painting of poles and other equipment. The City will be responsible for
<br />the hook up cost and application to secure an adequate power supply to the service pad or pole and will
<br />pay all monthly electrical service expenses necessary to operate the lighting facility.
<br />5.10. Additional Drainage. No party to this Agreement will drain any additional drainage volume into the storm
<br />sewer facilities constructed under the construction contract that was not included in the drainage for
<br />which the storm sewer facilities were designed, without first obtaining written permission to do so from
<br />the other party.
<br />6. Maintenance by the County
<br />Upon completion of the Project, the County will provide the following without cost or expense to the State:
<br />6.1. Storm Sewers. Routine maintenance of storm sewer facilities construction as shown on Exhibit B —
<br />Drainage Ownership and Maintenance. Routine maintenance includes, but is not limited to, removal of
<br />sediment, debris, vegetation, and ice from grates and catch basins, and any other maintenance activities
<br />necessary to preserve the facilities and to prevent conditions such as flooding, erosion, or sedimentation,
<br />this also includes informing the District Maintenance Engineer of any needed repairs.
<br />6.2. Signing. Exhibit A — Signing Ownership and Maintenance shows the signs that will be maintained by the
<br />County according to County maintenance practices.
<br />6.3. Retaining Walls. Maintenance of retaining wall construction as shown on Exhibit C — Wall Maintenance.
<br />Maintenance includes graffiti removal and any other maintenance activities necessary to perpetuate the
<br />walls in a safe, usable, and aesthetically acceptable condition.
<br />6.4. Additional Drainage. No party to this Agreement will drain any additional drainage volume into the storm
<br />sewer facilities constructed under the construction contract that was not included in the drainage for