Laserfiche WebLink
MnDOT Contract No.: 1052605 <br />5.5. Trails. Maintenance of any trail construction. Maintenance includes, but is not limited to, snow and ice <br />control/removal, sweeping and debris removal, patching, crack repair, pavement replacement, vegetation <br />control, signing, pavement markings, and any other maintenance activities necessary to perpetuate the <br />trails in a safe and usable condition. The LUP, currently LUP 0202-0108, will address additional <br />maintenance and liability responsibilities for the nonmotorized trail. <br />5.6. Retaining Walls. Maintenance of retaining wall construction as shown on ExhibitC — Wall Maintenance. <br />Maintenance includes graffiti removal and any other maintenance activities necessary to perpetuate the <br />walls in a safe, usable, and aesthetically acceptable condition. <br />5.7. Noise Walls. Maintenance of the non -highway side of noise wall construction as shown on Exhibit C — Wall <br />Maintenance. Maintenance includes vegetation control, graffiti removal on the non -highway side, and any <br />other maintenance activities necessary to perpetuate the walls in a safe, usable, and aesthetically <br />acceptable condition. <br />5.8. Signing. Exhibit A — Signing Ownership and Maintenance shows the signs that will be maintained by the <br />City according to City maintenance practices. <br />5.9. Lighting. Maintenance and ownership of lighting facilities construction as shown on Exhibit D — Lighting <br />Maintenance. Maintenance of electrical lighting systems includes everything within the system, from the <br />point of attachment to the power source or utility, to the last light on the feed point, including but not <br />limited to re-lamping of lighting units or replacing of LED luminaires, repair or replacement of all damaged <br />luminaire glassware, loose connections, luminaires when damaged or when ballasts fail, photoelectric <br />control on luminaires, defective starter boards or drivers, damaged fuse holders, blown fuses, knocked <br />down poles including wiring within the poles, damaged poles, pull boxes, underground wire, damaged <br />foundations, equipment pad, installation of approved splices or replacement of wires, repair or extending <br />of conduit, lighting cabinet maintenance including photoelectric cell, electrical distribution system, Gopher <br />State One Call (GSOC) locates, and painting of poles and other equipment. The City will be responsible for <br />the hook up cost and application to secure an adequate power supply to the service pad or pole and will <br />pay all monthly electrical service expenses necessary to operate the lighting facility. <br />5.10. Additional Drainage. No party to this Agreement will drain any additional drainage volume into the storm <br />sewer facilities constructed under the construction contract that was not included in the drainage for <br />which the storm sewer facilities were designed, without first obtaining written permission to do so from <br />the other party. <br />6. Maintenance by the County <br />Upon completion of the Project, the County will provide the following without cost or expense to the State: <br />6.1. Storm Sewers. Routine maintenance of storm sewer facilities construction as shown on Exhibit B — <br />Drainage Ownership and Maintenance. Routine maintenance includes, but is not limited to, removal of <br />sediment, debris, vegetation, and ice from grates and catch basins, and any other maintenance activities <br />necessary to preserve the facilities and to prevent conditions such as flooding, erosion, or sedimentation, <br />this also includes informing the District Maintenance Engineer of any needed repairs. <br />6.2. Signing. Exhibit A — Signing Ownership and Maintenance shows the signs that will be maintained by the <br />County according to County maintenance practices. <br />6.3. Retaining Walls. Maintenance of retaining wall construction as shown on Exhibit C — Wall Maintenance. <br />Maintenance includes graffiti removal and any other maintenance activities necessary to perpetuate the <br />walls in a safe, usable, and aesthetically acceptable condition. <br />6.4. Additional Drainage. No party to this Agreement will drain any additional drainage volume into the storm <br />sewer facilities constructed under the construction contract that was not included in the drainage for <br />In <br />Payable Standard <br />