Laserfiche WebLink
MnDOT Contract No.: 1052605 <br />usable, and aesthetically acceptable condition. The County will be responsible for oversize, overweight, <br />and special use permits. <br />B. City Responsibilities. The City will be responsible for maintenance of any sidewalk and/or trail on the <br />bridges and approach panels, without any cost to the State. Maintenance includes, but is not limited to, <br />snow, ice, debris, and graffiti removal, pavement marking maintenance, and signing maintenance. The <br />City will own and maintain non-standard (aesthetic) elements such as decorative lighting, ornamental <br />metal railing and any elements later added to the bridge. Maintenance of the aesthetic elements <br />includes, but is not limited to, graffiti removal and other routine maintenance activities necessary to <br />perpetuate the aesthetic elements in a safe, usable, and aesthetically acceptable condition. <br />C. State Responsibilities. The State will perform structural inspections and major maintenance of the <br />bridges without any cost to the County. Major maintenance includes all structural related maintenance, <br />including expansion joint flushing, deck crack sealing, crack sealing trails on the bridge and on approach <br />panels, painting, overlays, redecking and rehabilitation of the bridge, concrete bridge approach panels, <br />and structurally -supported signing on the bridge. The State will be responsible for maintenance of all <br />guardrails on TH 10 below the bridges, roadway signing that is attached to the bridges for the purpose <br />of TH 10 traffic, non -ornamental fencing on the Trunk Highway Right -of -Way, and graffiti removal <br />within the control of access below the bridges. The State will determine the safe load rating for the <br />bridges. The State will provide emergency response for traffic hits and restitution from insurance <br />companies or private parties who have damaged the bridges. <br />9. State Cost and Payment by the State <br />9.1. State Cost. The State's cost for grading, bituminous surfacing, ADA improvements, retaining walls, noise <br />walls, high tension cable guardrail, TMS, lighting, and roundabouts construction is defined in the <br />construction plan and the attached Schedule "I" and is reflective of the Participation Distribution prepared <br />by the Office of State Aid for Local Transportation. <br />A. State Federal -Aid Funds and State Match to the Federal -Aid Funds. $3,200,000.00 is the State Federal - <br />Aid funded portion and $800,000.00 is the State Match to the State Federal -Aid funds of the State <br />construction cost share and will be paid to the County through the State Aid Finance Office under the <br />Delegated Contract Process (State Aid Manual, Chapter 5.3). The State Federal -Aid funds and State <br />match to Federal -Aid funds will be capped at $4,000,000.00. <br />B. State SRC Funds. $8,000,000.00 is the capped amount of the estimated State funded construction cost <br />share and will be paid to the County through the State Aid Finance Office under the Delegated Contract <br />Process (State Aid Manual, Chapter 5.3). <br />C. State Bond Funds. $10,350,337.45 is the capped amount of the estimated State bond funded <br />construction cost share and will be paid to the County through the State Aid Finance Office under the <br />Delegated Contract Process (State Aid Manual, Chapter 5.3). <br />9.2. Limitations of State Payment; No State Payment to Contractor. The State's participation in the contract <br />construction is limited to the estimated amounts shown in Article 10.1, and the State's participation will <br />not change except by a mutually agreed written amendment to this Agreement. The State's payment <br />obligation extends only to the County. The County's contractor is not intended to be and will not be <br />deemed to be a third -party beneficiary of this Agreement. The County's contractor will have no right to <br />receive payment from the State. The State will have no responsibility for claims asserted against the <br />County by the County's contractor. <br />9.3. Schedule "YThe Preliminary Schedule "I" includes all anticipated State participation construction items <br />covered under this Agreement. The Preliminary Schedule "I" is based upon estimated quantities and <br />estimated unit prices. After the construction contract is awarded, the State will prepare a Revised Schedule <br />-10- <br />Payable Standard <br />