My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/26/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 09/26/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:27:09 AM
Creation date
9/27/2023 11:59:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/26/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL WORKSESSION MEMO Agenda Items #9.1 <br />Meeting Date: September 18, 2023 <br />Agenda Section: Ordinances & Resolutions <br />Item Description: RES/Support for the 2024 Capital Budget General Obligation Bonding Request for the <br />Anoka Rum River Dam Reconstruction and Modification Project <br />Submitted By: Lisa LaCasse, Public Services Administrator <br />BACKGROUND INFORMATION <br />In 1853, the first timber dam was constructed to provide power for the saw <br />mills in the City of Anoka. <br />In 1880, W.D. Washburn built the Lincoln Flour Mill at the dam site and <br />the dam produced over 250 HP to power the mill. The total ultimate power <br />r � <br />produced by the dam was 725 HP and in 1931, the Pillsbury Milling - <br />Company discontinued the milling operations in Anoka. - <br />In the summer of 1891, the Rum River recreational pool was created. Log <br />timbers and flashboards were placed on the Dam at Anoka to raise the level of the Rum River. <br />On January 19, 1935 the Pillsbury -Washburn Flour Mills Company granted and deeded the flowage rights forever <br />to the City of Anoka. As the owner, the city has been and continues to be responsible for the ongoing operations, <br />maintenance, repair and replacement of the dam. <br />On March 11, 193 5 the City of Anoka purchased the Dam at Anoka from the Pillsbury Flour Mills Company and <br />became the sole owner of the dam. As the owner, the city has been and continues to be responsible for the ongoing <br />operations, maintenance, repair and replacement of the dam. <br />In 2014, the water infrastructure bill passed by Congress required Army Corp of <br />Engineers to close Upper St. Anthony Lock and Dam to quell the possible spread <br />of invasive species. With this in place and the Coon Rapids Three Rivers Park <br />Dam as the second redundant barrier upstream for the invasive species the <br />consideration of investing in another redundant barrier at the Rum River Dam in <br />Anoka was not selected by the MN legislators. <br />On May 23, 2023 the State Bonding Bill was presented to the Governor <br />Dayton and on May 24, 2023 he signed the State Bonding Bill into law. As <br />part of the bill, there was $500,000 granted to the City of Anoka for feasibility <br />studies for the design, engineering, and environmental analysis for the repair <br />and reconstruction of the Rum River Dam. This appropriation is onetime and is <br />available until June 30, 2027. <br />On July 10, 2023 Marianne Conboy, Capital Budget Coordinator submitted <br />Anoka's State of Minnesota 2024 Capital Budget request for safety <br />
The URL can be used to link to this page
Your browser does not support the video tag.