My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 10/10/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:28:20 AM
Creation date
10/10/2023 1:25:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Plan Approved <br /> PIERCE PINI & ASSOCIATES , INC . <br /> CONSULTING CIVIL ENGINEERS <br /> Dehn Oil Site Redevelopment <br /> Dehn Oil has recently purchased the property at 6651 1415Y Avenue NW in Ramsey. The property is <br /> zoned E-2 and has amulti-tenant commercial building on the south portion of the property parallel to <br /> 1415t. There is a bituminous parking lot between the building and the public street as well as another <br /> bituminous parking area and vehicle staging area on the north side of the building. The north half of the <br /> property is undeveloped and has been used for aggregate stockpile and rock crushing operations in the <br /> past. There is conditional use permit in place that permits the aggregate stockpiling to be placed on the <br /> aggregate surfacing. <br /> Recently there have been site improvements on the property that include the addition of two large <br /> above ground fuel storage tanks for propane. The fuel tanks are constructed on concrete footings with <br /> a fuel pump area southwest of the tanks. <br /> City code requires that all exterior storage areas, loading areas and access roads be paved. The north <br /> portion of the property is currently all compacted aggregate. The proposed site improvements include a <br /> 20'wide bituminous access road to the fueling/loading area as well as paving of the fueling area and the <br /> storage area for empty fuel tanks and vehicles. <br /> In addition to the bituminous pavement improvements,the above ground storage tanks will be fenced <br /> in with 6'chain link security fencing. The fenced area will have to access gates per fire department <br /> requirements as well as two additional gates for snow removal. <br /> Protective bollards are also proposed to be added around the two large above ground fuel tanks and the <br /> pumping station. Bollards will be installed at 4'spacing and in conformance with the city of Ramsey's <br /> above ground fuel storage tank installation requirements. <br /> The existing aggregate stockpiles will continue to be used and the project is requesting that the existing <br /> conditional use approval to remain for exterior storage of those features on unpaved areas. <br /> The site drains north to the existing stormwater pond along the north property line. The proposed site <br /> improvements will not alter the general drainage pattern and runoff will continue to be directed to the <br /> existing pond. This project has been discussed with Lower Rum River Watershed Management <br /> Organization and will require a permit for erosion control and stormwater management. The scope of <br /> work will not require volume control per LRRWMO requirements and the existing pond meets the needs <br /> for rate control and water quality. <br />
The URL can be used to link to this page
Your browser does not support the video tag.