Laserfiche WebLink
5. 12. <br /> CC Regular Session <br /> Meeting Date: 10/10/2023 <br /> Primary Strategic Plan Initiative: Improve the safety and mobility of transportation corridors. <br /> Information <br /> Title <br /> Adopt Resolution#23-246 Approving Change Order No. 4 for Ramsey Gateway Highway 10 Widening <br /> Improvements <br /> Purpose/Background: <br /> During construction of the 2023 Ramsey Gateway Highway 10 Widening Improvements, the contractor proposed <br /> substituting 8-inch and 10-inch PVC C900 watermain in lieu of the 8-inch and 10-inch ductile iron pipe (DIP) <br /> watermain included in the plans and specifications as bid on by the awarded contractor,North Pine Aggregate. <br /> This material substitution was strictly proposed as a cost savings measure,which City staff supported and <br /> approved in order to allow the contractor to order the material in time to install it without delaying the project. <br /> Notification: <br /> Staff strives to present Change Orders to the City Council before the proposed work is completed. However, from <br /> time to time Staff approves Change Orders without prior Council approval, such as when a significant cost <br /> savings can be realized without sacrificing quality and there isn't time to obtain Council approval first, when there <br /> is an emergency situation that must be addressed, or when work needs to be done to avoid costly project delays. In <br /> such instances, Staff strives to present the Change Order to Council for their after-the-fact approval in as timely a <br /> manner as possible. <br /> Observations/Alternatives: <br /> Up until roughly 10 years ago,the City only allowed DIP watermain to be used for our water supply system. The <br /> City then gradually started allowing PVC C900 pipe tp be used for watermain in green spaces. And in recent <br /> years,that City has allowed PVC C900 watermain to be installed under streets. Some other cities have been <br /> using PVC C900 watermain for decades and based on the results to date staff is now confident that PVC C900 <br /> watermain is as durable as DIP watermain when properly installed. In addition, manufacturers are now selling <br /> better fittings and saddles that better accommodate connections of service lines and other pipe materials to PVC <br /> C900 pipe, which had been an issue in the past. <br /> Funding Source: <br /> Executing Change Order No. 4 saved the City$76,050.00. <br /> Recommendation: <br /> Staff recommends adopting Resolution#23-246 approving Change Order No. 4 for the Ramsey Gateway Highway <br /> 10 Widening Improvements. <br /> Action: <br /> Adopt Resolution#23-246 approving Change Order No. 4 for the Ramsey Gateway Highway 10 Widening <br /> Improvements. <br /> Attachments <br />