My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/10/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 10/10/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:28:20 AM
Creation date
10/10/2023 1:25:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/10/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 15. <br /> CC Regular Session <br /> Meeting Date: 10/10/2023 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Information <br /> Title <br /> Adopt Resolutions#23-250, #23-251,#23-252, and#23-253 Accepting Sewer Cleaning and Televising Proposals <br /> for 2024 Pavement Management Program Projects <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolutions#23-250, #23-251, #23-252, and#23-253 accepting sewer <br /> cleaning and televising proposals for 2024 pavement management program projects. <br /> Background: <br /> Testing of existing municipal utilities, which includes sanitary sewer, storm sewer, and watermain, is standard <br /> practice when designing street reconstruction projects.Newly paved streets in Ramsey are anticipated to have a <br /> 60-year life span, assuming proactive maintenance. Identifying damaged or failing municipal utilities under <br /> streets before they are reconstructed allows the required repair or replacement work to be completed as part of the <br /> street reconstruction project before the new pavement is placed,preventing costly pavement repairs after the fact. <br /> Utilities testing consists of first cleaning the pipe with a water j etter,then using a camera to televise the inside of <br /> the sewer pipes (sanitary and storm). Sound enhancement equipment is used to listen for leaks in watermain <br /> between hydrants and valves. Staff does not have the equipment needed to complete this work in-house, Public <br /> Works Staff does not have the staff hours to clean the sewer pipes in advance of being televised. <br /> Watermain leak testing was previously performed on a project by project basis. In the summer of 2023, a <br /> City-wide leak testing was performed, including the proposed project areas. No leaks were detected within any of <br /> the 2024 street reconstruction project areas. <br /> Pipe Televising Proposals—Sanitary and Storm Sewer <br /> Televising sewer pipes informs Staff of the conditions of the pipes, and locates existing damage, if present. This <br /> allows Staff to include the required repair or replacement work for any damaged pipes into the street <br /> reconstruction plans,which is more cost effective than doing repairs as standalone projects, or as change orders <br /> during the reconstruction project. <br /> Staff requested proposals for each street reconstruction project from six(6) contractors known to perform this <br /> work. Proposals for each project were received from one(1) of the contractors,which are tabulated below. <br /> F24-01 <br /> Hydro-Klean,LLC Proposal <br /> Barthel's Rum River Acres and White Pines Estateseconstructions $3,558.75 <br /> SIP 24-05 MSA Xkimo Street Reconstruction $17,338.10 <br /> IP 24-12 Juniper Woods 1st—3 rd Street Reconstructions $21,222.16 _ <br /> IP 24-13 Fox Ridge Estates 1st&2nd Street Reconstructions $10 048.75 <br /> Project Totals $52.7167.76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.