Laserfiche WebLink
BASIS OF PAYMENT: <br /> Mobilization —Payment shall be made on a lump sum basis for the mobilization of equipment. <br /> Traffic Control—Payment shall be made on a lump sum basis as compensation for all equipment, <br /> material, and labor costs required for the installation and maintenance of traffic control measures <br /> (signage, barricades, flashers, flaggers, etc.), as directed by the Engineer, for any local traffic <br /> disruptions or temporary closures. <br /> Clean and Televise Sewer—Payment shall be made on a per lineal foot basis as compensation for <br /> all equipment, material, and labor costs required for cleaning, removal and disposal of material, <br /> description and video of the sewer lines. <br /> Other Items — The cost of any additional equipment, labor, materials, tools and supplies which <br /> have not been specifically identified in this section for payment, but are required to complete the <br /> project per the plans and specifications shall be considered incidental to the project. <br /> 5 <br />