Laserfiche WebLink
6. 2. <br />Regular Planning Commission <br />Meeting Date: 10/26/2023 <br />Primary Strategic Plan Initiative: Promote economic growth and development. <br />Information <br />Title: <br />"Waterfront Village" - Sketch Plan for Approximately 110 detached townhomes by Centra Homes <br />Purpose/Background: <br />Centra Homes has submitted a sketch plan for a proposed detached townhome development in the COR. The <br />applicant has been working with the City's Economic Development Authority and was selected to submit <br />development plans for the site at the southwest corner of Bunker Lake Boulevard and Zeolite St. NW. Centra <br />was selected based on the unit design and adherence to COR Framework design principles over another <br />developer. The sketch plan is the first step in the plat review process. The sketch plan is intended for the <br />Planning Commission and neighbors to provide high-level feedback so that the applicant can then go and spend <br />money to prepare the more detailed plans needed for a preliminary plat application. <br />The proposed detached unit is similar to the units Centra built in "Cottages at the COR" at the southwest corner of <br />Ramey Boulevard and Bunker Lake Boulevard. Each unit will have a front porch and front door with a <br />rear -loaded garage. All units are two stories in height. It is recommended that the exposed end units have more <br />architectural interest than the sides of the existing units as four-sided architecture is called out in the Framework. <br />The interior roads are all 25-foot wide private roadways maintained by the association. Four areas are shown with <br />parking bump -outs. All driveways are wide enough to accommodate parking for two cars. There is one dead-end <br />stub street at the northwest corner of the site. This design has been reviewed and approved by the Fire <br />Department and it is similar to other stub streets in the COR. Other areas of the private roadway will need to be <br />signed "no parking fire lane." Zeolite Street and Ramsey Parkway are expected to be constructed in 2024. These <br />roadways will each have on -street parking available for daytime use. <br />A series of walkways are shown to provide access from the parking areas to the front doors of each unit. Some of <br />the walkways should shift or be added to provide better access to the parking areas. <br />The southern row of units (1-11) are shown setback a greater distance from proposed Ramsey Parkway due to a <br />proposed storm sewer. The storm pipe design is being worked on currently and is likely to be located beneath the <br />roadway, freeing up the land north of the roadway. The units will need to have a 15-foot build -to positioning on <br />the site. The shifting south may allow for a few additional units next to units 30, 22, and 21. The sketch plan <br />shows 110 units. <br />The site is currently zoned COR-2b which is a retail subdistrict. It will need to be rezoned to COR-4b to <br />accommodate the townhomes. This rezoning is being included with the Zoning Code Update work that has been <br />underway for several months. <br />Notification: <br />Mailed notifications were sent to property owners within 700 feet of the site. A sign was not placed on the <br />property due to the mass grading work being done with the Waterfront Park project. <br />Recommendation: <br />