Laserfiche WebLink
St. Francis Boulevard Trail <br />ALL OFF -ROAD TRAIL <br />Length/Area Unit Price Cost <br />use Tral I 1001D 5.00 545?00 D. <br />Sped a I Slope Areas ICK3 100.00 W.000.00 South end. includes utility a n c r-LIVCft conflicts_ <br />icrigati-on rind Tree Conflicm.'.s 2510.00 $ 20,000.010 Al lowanc a f o r t ree re locat io n s a rd i rr igat ion raga i rs. <br />Subtota 1 <br />Mobil izatiDn <br />Traffic Corra-1 <br />Total Co ristru Rio n EsO ma to <br />Le ngt h <br />Cost par L� Cher-k <br />Administrative (Low) <br />Ad mi n"I suetlive(H pgh) <br />8.00�& $50200.00 <br />3.00:Y-0 $10950.DD <br />72' 15a. Do <br />1.1000 <br />$72.15 <br />-4 <br />10082150 15 Percent for a Iota Illy f un ded trai I <br />518pO37.50 25 Percent foc a fed -arally funded trail <br />City of Ramsey peace I a L so uth -and. Aamrd ease me n t c r t [,--i s p rope rLy pr io r to sa Ie. <br />Need trai I easements over all pa rcel s north of C i-,.y p rope rt V. 93 0 feet of I ength x 20 feet w1de <br />Ba se I ra i I Cost, $45/1-F- I ncl udes grad i ng. Cam. bltum Iflous, rRStDFa tion, se adi ng. <br />Rita i n i ng walls'- Assume 2�/SF above g.rDufld (exposed surfac a). <br />I r-2�ti cl ea ri ng and trlrnm ling, $ 10001acre. <br />Boa rdwri I k or Bridge, $200/1-F <br />CLN-2rt EXteq1SioflS'$11X1/LF <br />0 it KD@ d. S for stripling a n d signaga and c msswa I k- <br />Cur b ande ( 3uttle i'. $ 100/ LF - I ricl ud as b itu mi no u s patch ling i n front of curb and d ra i rage pipe a nd structu res <br />Wetl D n c Replacement, 50.,000/Ac to <br />Mobilization - 8% <br />Traffic co ntroll.- 3% <br />(2018 pricing) <br />