Laserfiche WebLink
GOALS-OF CURRENT YEAR BtlQGET: <br /> Maintain and improve city's rating of 7.0 average of road condition <br /> Increase use of contracted services on pothole repair(velocity patching) <br /> Increase prevenative maintenace to prolong the life of our public streets <br /> Maintain our city vehicles and equipment to the highest level possible <br /> Performance Measurements; <br /> 2019 Actual 2020 Actual 2021 Actual 2022 Actual 2023 Projected 2024 Projected <br /> Crack filling(miles) 21.5 7 20.88 10.37 15 19 <br /> 5ealcoating(mires) 0 0 0 0 0 0 <br /> Asphalt patching(tons) 532 500 380 385 390 <br /> �50— <br />