Laserfiche WebLink
4.3 <br /> <br />4.4 <br /> <br />institutions designated in Exhibit A. The specified Cable Modems and monthly <br />Cable Modem service shall be made available, upon request, to every school and <br />governmental institution within six (6) months of the date that two-way high- <br />speed Internet access is introduced to Subscribers on a commercial basis. <br /> <br />System and Institutional Network Construction Timetable. <br /> <br />4.3.1 <br /> <br />Grantee shall complete all construction related to the System Upgrade (including <br />the Institutional Network) and shall fully activate the upgraded System no later <br />than December 31, 2002. The Grantee shall provide for phased activation <br />launches of the subscriber network as Nodes are completed. Failure to timely <br />complete such construction shall be a violation of this Franchise. <br /> <br />4.3.2 <br /> <br />Within ninety (90) days after the Effective Date of this Franchise, the Grantee <br />shall commence application for necessary permits, licenses, certificates and <br />authorizations which are required in the conduct of its business. <br /> <br />4.3.3 <br /> <br />Within ninety (90) days after the Effective Date of this Franchise, Grantee shall <br />commence System preliminary construction, walkout, electronic design, fiber <br />design, and other associated System Upgrade steps, and shall give written notice <br />to the City upon commencement of such activities. <br /> <br />4.3.4 All construction shall be performed in accordance with applicable laws and <br /> regulations, except where specifically waived by the City. <br /> <br />4.3.5 <br /> <br />The Grantee shall provide the City with notice prior to commencement of steps of <br />the System Upgrade in which possible service disruptions or physical construction <br />activities may occur, including but not limited to: (i) tap pedestal replacements; <br />(ii) amplifier/line extender pedestal replacements; (iii) underground duct <br />replacement; (iv) overlashing of aerial fiber optic lines; and (v) underground <br />placement or replacement of coaxial cables. <br /> <br />4.3.6 <br /> <br />Upon completion of the System Upgrade initial design, the Grantee shall make <br />available to the City for review, on a confidential basis, a concise description of <br />the facilities proposed to be erected or installed, and subscriber network design <br />prints/map(s), which shall include at least the following elements: (i) trunk and <br />feeder design; (ii) fiber routes; (iii) Node locations; (iv) standby power supply <br />locations; and (v) areas of the City to be served by each Node. <br /> <br />4.3.7 No System Node shall be activated until it is tested, and the Grantee determines <br /> that all applicable technical standards have been met or exceeded. <br /> <br />Periodic Progress Reporting. <br /> <br />4.4.1 Following commencement of construction of the System Upgrade or any similar <br /> major construction, the Grantee shall, upon request of the City, meet with the City <br /> <br />21 <br /> <br /> <br />