Laserfiche WebLink
7.5 Interconnection and Use of Adiacent Institutional Networks. <br /> <br />7.5.1 <br /> <br />Concurrent with the System Upgrade, the Grantee shall construct interconnection <br />links to the Institutional Networks of Grantee's Systems serving: (i) the City of Coon <br />Rapids, Minnesota; (ii) the member cities of the North Metro Telecommunications <br />Commission; and (iii) the member cities of the Northwest Suburban Cable <br />Communications Commission ("Adjacent Institutional Networks"). Each <br />interconnection link shall be completed within a reasonable timeframe mutually <br />agreed upon by the Commission and the Grantee, unless an extension is granted upon <br />petition by the Grantee. The Grantee shall be responsible for switching all signals <br />carried over the interconnection links described in this paragraph, including signals <br />that are originated by or intended for the City, Commission or I-Net Users. <br /> <br />7.5.2 <br /> <br />Every interconnection link established pursuant to this Section 7.5 shall, at a <br />minimum: (A) use a fiber optic transmission medium (B) allow for the seamless <br />transmission of all required I-Net signals on both systems; and (C) provide, for the <br />Commission's exclusive use, at least one (1) 6 MHz analog channel for forward video <br />purposes, one (1) 6 MHz analog channel for return video purposes, one (1) 6 MHz <br />channel for forward data and/or other purposes and one (1) 6 MHz analog channel for <br />return data and/or other purposes. <br /> <br />7.5.3 <br /> <br />The Grantee shall cooperate with any interconnection corporation, regional <br />interconnection authority, or state or federal agency which may be hereafter <br />established for the purpose of regulating, facilitating, financing or otherwise <br />providing for the interconnection of cable systems beyond the boundaries of the City. <br /> <br />7.5.4 <br /> <br />At the Commission's request, the Grantee shall use its best efforts to obtain any <br />required authorization from the North Metro Telecommunications Commission, the <br />Northwest Suburban Cable Commission and the City of Coon Rapids, Minnesota (the <br />"Adjacent Commissions") which is necessary to allow the Commission, the City and <br />I-Net Users to utilize capacity on the Adjacent Institutional Networks. In the event <br />the Grantee is unable to obtain such authorization after using its best efforts, or if the <br />Adjacent Institutional Networks are not under the control of the Adjacent <br />Commissions, the Grantee shall provide the Commission, the City and/or I-Net Users <br />with available bandwidth on the Adjacent Institutional Networks, free of charge, as <br />follows: if capacity on the Adjacent Institutional Networks is available and under the <br />Grantee's control (or if the Grantee has I-Net capacity available to it under the terms <br />of its franchises with the Adjacent Commissions) the Grantee shall dedicate and <br />furnish for Commission, City or I-Net User use the greater of 12 MHz of bandwidth, <br />or the maximum amount of bandwidth available and under Grantee's control, up to 12 <br />MHz. Upon request, the Grantee shall make additional Adjacent Institutional <br />Network capacity available to the Commission, the City and I-Net Users at Actual <br />Cost, provided that additional bandwidth is available and under the Grantee's control. <br />In no event shall Grantee have any obligation or be responsible for providing any <br />additional equipment as a result of this subsection. <br /> <br />39 <br /> <br /> <br />