Laserfiche WebLink
Co <br /> <br />Subdivision 3. The following maps of the Site which include all areas within one <br />quarter mile (1,320') of the site. All maps shall be drawn at a scale of no greater <br />than one inch (1") to three hundred feet (300') and contain contour lines at two foot <br />(2) intervals unless otherwise stated below: <br /> <br />EXISTING CONDITIONS TO INCLUDE: <br /> <br />(1) <br /> <br />Existing homes, buildings and structures, lakes, ponds, <br />watercourses, wetlands, drainage, sinkholes, rock out-croppings, <br />roadways, easements, vegetation, public parks, and other applicable <br />details. <br /> <br />(2) Existing wells and water table elevations. <br /> <br />(3) Existing land use and zoning. <br /> <br />(4) <br /> <br />Normal high water mark of any lake, pond or towage and regional <br />flood plain location. <br /> <br />(5) Existing airport airspace requirements. <br /> <br />(6) Existing elevations and topography of the site. <br /> <br />ii. <br /> <br />MAPB <br /> <br />PROPOSED OPERATIONS AND DEVELOPMENT PLAN <br />TO INCLUDE: <br /> <br />(1) Soil boring locations with surface elevations. <br /> <br />(2) <br /> <br />Present and planned pertinent features, including but not limited to <br />roads, signs, utilities, screening, buffer zone, fencing, gate, shelter <br />and equipment buildings. <br /> <br />(3) <br /> <br />Location and acreage of earthwork and fill operations including <br />areas to be mined showing depth and final grades of proposed <br />excavation. <br /> <br />(4) <br /> <br />Location and acreage of refuse disposal deposits showing maximum <br />height of deposits. <br /> <br />(5) Location of machinery to be used in the mining operation. <br /> <br />(6) <br /> <br />Source of liner and cover material and method of protecting material <br />for winter operation. <br /> <br />(7) <br /> <br />Location of storage of mined materials showing height of storage <br />deposits. <br /> <br />(8) Location of vehicle parking. <br /> <br />(9) Location of storage of explosives if applicable. <br /> <br />(10) <br /> <br />Plan of development including any excavation, trenching and fill <br />shall be shown progressively with time. <br /> <br /> <br />