My WebLink
|
Help
|
About
|
Sign Out
Home
Ordinance - #93-01 - 01/26/1993
Ramsey
>
Public
>
Ordinances
>
1993
>
Ordinance - #93-01 - 01/26/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 12:50:49 PM
Creation date
11/16/2023 2:24:10 PM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Ordinances
Resolution or Ordinance Number
#93-01
Document Date
01/26/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 9!50.50 is hereby repealed and amended to read as follows: <br /> <br /> Subdivision 1. General conditions. Upon receipt of preliminary <br />approval Of a plat by the City Council and prior to Council approval of the final plat, the <br />subdivide shall make provision in the manner hereinafter set forth for the installation, at <br />the sole expense of the subdivider, of such improvements as shall be required by the City, <br />which imi~roOements may include, but are not limited to, streets, sidewalks, public water <br />systems, Sani~ sewer systems, surface and storm drainage systems and public utility <br />services. ~Tha installation of said improvements shall be in conformity with City approved <br />construction plans and specifications and all applicable City standards and code sections. <br /> <br /> Subd. 2. Basic improvements required. <br /> <br /> a. Policy. It is hereby declared to be the policy of the City to, as soon <br /> as practicable after approval of the proposed plat, require the <br /> installation of all of the following improvements within the <br /> subdivision: <br /> <br /> 1. Stage I Improvements: Major construction items needed to <br /> be constructed with a plat prior to issuance of any building <br /> permits: <br /> <br />e <br /> <br />(a) Trunk Sanitary Sewer (Urban) <br />(b) Trunk Watermain (Urban) <br />(c) Trunk Storm Drainage Facilities (when specified <br />(d) Source and Storage (Future Water Facilities) <br />(e) Lateral Sanitary Sewer (Urban) <br />(f) Lateral Watermain (Urban) <br />(g) Lateral Storm Sewer and/or Ponding <br />(h) Streets <br />(i) Concrete Curb and Gutter (Urban) <br />(j) Street Traffic Control Signs <br />(k) Easement Acquisition <br />(I) Lot Grading <br />(m) Trail and Park Development <br />(n) Street Lights <br /> <br />Stage II Improvements: Minor and miscellaneous items <br />required prior to acceptance by the City <br /> <br />(a) Inspection <br />(b) Street Striping and Signing <br />(c) Street Sweeping <br />(d) Sidewalk (Optional) <br />(e) Seal Coating (or escrow for) <br />(f) Adjusting Water Shut-Off Boxes (Urban) <br />(g) Maintenance of Storm Water Sewer and Facilities <br />(h) Boulevard Sodding <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.