Laserfiche WebLink
(1) Ail substations shall be subject to the <br />site planning requirements set forth in <br />Article 170.0112E D) 2), and <br /> <br />(2) New substations or refurbishment of <br />existing substations shall be compatible in <br />height, scale, building materials, landscap- <br />ing and signing with the surrounding natural <br />environment or land uses. Screening by <br />natural means is encouraged and should be <br />compatible with the surrounding environment. <br /> <br />d) Pipelines. Pipelines and underground utility <br />facilities shall be subject to the following stand- <br />ards: <br /> <br />(1) Ail pipelines and underground facilities <br />shall be subject to the site planning require- <br />ments set forth in Article 170.0112E D) 2); <br />and <br /> <br />(2) The facilities shall be located to avoid <br />wetlands, woodlands and areas of unstable <br />soils; and <br /> <br />(3) All underground placing of utility facili- <br />ties and pipelines shall be followed by reveg- <br />etation and rehabilitation to the conditions <br />which existed on site prior to development. <br /> <br />2) Public and Private Roads and Railways. New roads <br />and railways crossing the Critical Area Corridor or <br />routed within the Critical Area Corridor shall meet the <br />following standards: <br /> <br />a) Roads and railways shall be constructed to min- <br />imize impacts on the natural terrain and natural <br /> <br />b) Cuts and fills are to be avoided. <br /> <br />c) All roads and railways shall be subject to the <br />site planning requirements set forth in Article <br />170.0112E D) 2). <br /> <br />d) New roads and railways shall not utilize the <br />river corridor as a convenient right-of-way for <br />new arterials or main lines. <br /> <br />e) New roads and railways shall be restricted to <br />those facilities needed to access existing and <br />planned residential, commercial and industrial <br /> Ordinance 985-2 <br /> <br />Page 30 .of 37 <br /> <br /> <br />