My WebLink
|
Help
|
About
|
Sign Out
Home
Ordinance - #87-09 - 12/08/1987
Ramsey
>
Public
>
Ordinances
>
1987
>
Ordinance - #87-09 - 12/08/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 3:04:49 PM
Creation date
11/17/2023 10:15:04 AM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Ordinances
Resolution or Ordinance Number
#87-09
Document Date
12/08/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Material of the kinds and for the purposes described herein <br />shall not be hauled from any source until the haul road from <br />that source has been officially designated as a haul road and <br />all materials hauled from the source shall be hauled over <br />that road. <br /> <br />The Operator shall select a haul road (or roads) over which <br />he proposes to haul the materials, as previously described, <br />and notify the City Engineer as to the road (or roads) so <br />selected. Within 15 calendar days after being notified of <br />the haul road selection, the City Engineer will, if he finds <br />the road (or roads) so selected to be a practicable route, <br />approve that road as a designated haul road. <br /> <br />After a haul road has been officially designated, the <br />Operator may select a different road for official designation <br />under the same conditions as previously stated. However, any <br />changes made in haul road designation shall not relieve the <br />Operator of his obligation of restoring the previously <br />designated haul road if any of the above described materials <br />were hauled over that road. <br /> <br />While hauling operations are in progress, the Operator shall <br />maintain the haul road in a condition satisfactory to the <br />City Engineer. This work shall include application of water, <br />bituminous material, or calcium chloride to the road surface <br />as may be necessary to alleviate dust nuisance and eliminate <br />traffic hazards. This work shall also include the removal of <br />spillage of any material on the haul road. <br /> <br />When hauling operations over any haul road are completed, the <br />Operator shall (at his option): (a) restore that haul road to <br />a condition at least equal to that which existed at the time <br />the hauling operations were started; or (b) compensate the <br />local road authority in an amount satisfactory to that road <br />authority and concurred in by the City Engineer for the <br />restoration of that haul road by the City. <br /> <br />The fact that other traffic has used the haul road <br />concurrently with the hauling of the above described <br />materials shall not relieve the Operator of his obligation to <br />maintain and restore the haul road as above provided. <br /> <br />The City Engineer's determination as to the kind and amount <br />of maintenance and restoration work required to restore the <br />haul road to a condition equal to that which existed at the <br />time the hauling operations were started shall be final, <br />binding and conclusive. <br /> <br />When hauling over any designated haul road has been completed <br />and the Operator has restored that road or has compensated <br />for that restoration as required, the City Engineer will <br />accept such restoration or concur in such financial <br />settlement for the restoration of the haul road (as the' case <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.