Laserfiche WebLink
EXHIBIT B <br /> Fees Payable to the City(2023 Rates) <br /> 1. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br /> Development Fee requirements. PERMITTEE must pay a Trail Development Fee of$81,000.00 <br /> (54 units x$1,500.00 per unit). <br /> 2. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br /> applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary Sewer <br /> Trunk Fee of$72,846.00 (54 units x $1,349.00). <br /> 3. Water Connection(Trunk)Fees. The PERMITTEE is responsible for satisfying applicable Water <br /> Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of$108,486.00 (54 units x <br /> $2,009.00 per unit). <br /> 4. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br /> Stormwater Trunk Fee requirements. PERMITTEE must pay a Stormwater Management Fee <br /> of$28,836.00 (54 units x $534.00 per unit). <br /> 5. Street Sign Fee. While the CITY provides and installs the street name and traffic control signage, <br /> the PERMITTEE is responsible for paying for them at a rate of$245 per sign. PERMITTEE <br /> must pay a Street Sign Fee of$4,165.00($245 x 2 street name signs; $245x 12 no parking signs; <br /> $245 x 3 stop signs). <br /> 6. Development Fees for the Outlots. The PERMITTEE acknowledges that development fees are <br /> not being collected for any Outlots.The PERMITTEE acknowledges that development fees will <br /> be due upon development of any of the Outlots. The rate in effect at the time said future plat(s) <br /> is recorded will be collected. <br /> 12 <br />