Laserfiche WebLink
�1GN� C O N S T R U C T IO N Proposal <br /> Y <br /> COMMERCIAL 6 INDUSTRIAL CONTRACTORS <br /> 1401 Park Road Chanhassen, MN 55317 <br /> www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br /> SEND TO <br /> Company name From <br /> AE2S Kevin Vranicar <br /> Attention Date <br /> Mr. Ryan Hanson 10/2/2023 <br /> E-mail Phone Magney Proposal#004 <br /> Rvan.Hanson(@-ae2s.com (612)220-0154 Request For Proposal No. 004 Blower Piping Modifications <br /> Fl <br /> Urgent F] Please comment X Please review � For your information <br /> Total pages,including cover: 6 <br /> COMMENTS <br /> Re: Ramsey Water Treatment Plant - Ramsey, MN <br /> Ryan, <br /> Magney Construction, Inc. is pleased to present the following quotation to provide the necessary labor, material <br /> and equipment to modify and upsize the specified 8-inch blower system piping, fittings, valves, nuts, bolts and <br /> gaskets to10-inch piping, fittings, valves, nuts, bolts and gaskets, per your Request For Proposal No. 004. We <br /> have also included the costs to relocate the blower inlet/discharge piping locations from the sidewall to the <br /> roof, as shown. The costs associated with this change are summarized below. <br /> Labor: Additional Labor Required for 10" Pipe vs. 8" Pipe $ 57878.49 <br /> Material: Additional Costs for 10" vs. 8" Pipe, Fittings, N,B&G, (incl. tax) $ 34,145.74 <br /> Material: Vessco, Inc. - 10" vs. 8" Valves (incl. tax) (see attached) $ 27789.63 <br /> Material: Major Mechanical - Roof Curb & Curb Cover(see attached) $ 17192.46 <br /> Equipment: Misc. Small Tools and Equipment (10% of Labor) $ 587.85 <br /> Subcontractor: RTL Construction, Inc. - Install Roof Curb (see attached) $ 288.31 <br /> Subcontractor: Central Roofing Company- Roofing Work (see attached) $ 750.00 <br /> Subcontractor: Fresh Blast Painting -Additional Painting (see attached) $ 27040.00 <br /> Subtotal $ 477672.47 <br /> General Contractor's Overhead $ 67843.04 <br /> Bond & Insurance premiums $ 715.09 <br /> Lump Sum Total: $ 55,230.60 <br /> Additional Working Days Required for this Change (Including material lead time): TBD <br /> Please review this proposal and feel free to contact me with any questions, comments or concerns. <br /> Thank you, <br /> Kevin Vranicar <br /> Vice President Accepted By Date <br /> Page 1 of 1 <br />