Laserfiche WebLink
FRESH <br /> 0 <br /> Office: 651-447-2218 <br /> Date 08/11/2023 <br /> We are pleased to submit a proposal for the following project: <br /> Ramsey MN WTP <br /> For the following sections: <br /> RFP 004 -Paint <br /> Our Proposal is for: <br /> Two Thousand, Forty Dollars. $2,9040e00 <br /> RFP dated: 5/26/2023 <br /> Addenda: N/A <br /> Unit Prices: None <br /> Allowances: None <br /> Alternates: None <br /> OUR BASE BID INCLUDES: <br /> 1. Prep and coatings per specification on larger blower piping and valves. <br /> 2. Labor, Materials, Equipment, Sales Tax, &Mobilization. <br /> OUR BASE BID DOES NOT INCLUDE: <br /> L Any bonds required by Owner or GC. <br /> 2. Prevailing wage or Davis-Bacon wage rates. <br /> 3. Pipe labeling. <br /> 4. Temp heat—indirect, externally-vented temp heat to be provided by GC or Owner if needed. <br /> OTHER BID NOTES: <br /> 1. All paint systems included in this bid will be Sherwin-Williams products. Where factory/shop priming is <br /> required by spec,please ensure manufacturers are using the appropriately compatible Sherwin-Williams <br /> primer. <br /> SETTING THE STANDARD.BETTER BLASTING.PERIOD. <br />