Laserfiche WebLink
The preliminary design indicates a possibility for the improvements and disturbed areas to be contained within <br /> city and state-owned right-of-ways. During final design, if it is deemed necessary to extend the work outside of <br /> right-of-way, City Staff will work with property owners to obtain right of entry and/or temporary construction <br /> easements as necessary. <br /> Project Timelines <br /> Staff is proposing to prepare plans and specifications for this project in-house, as part of their normal duties. The <br /> following are the proposed general project timelines: <br /> November 14, 2023 City Council authorization to prepare plans and specifications <br /> City Council awards topographic survey proposal <br /> Jan—April 2024 Staff prepares plans and specifications <br /> City Council awards geotechnical evaluation proposal <br /> May—June 2024 City Council approves plans, authorizes bidding <br /> June- July 2024 Bid opening, City Council awards contracts <br /> July-Aug 2024 Begin Construction <br /> Summer 2024 Finish Construction <br /> Due to the nature of the work, the ideal time to perform construction is the typically drier months of July and <br /> August. <br /> Notification: <br /> If City Council orders plans and specifications for this improvement project, Staff will send notification letters to <br /> residents impacted by these improvements. <br /> Observations/Alternatives: <br /> Observations: <br /> Estimates are based off of preliminary plans and will be updated during the design process. <br /> Alternatives: <br /> Motion to adopt Resolution#23-280 ordering plans and specifications for 180th Lane Drainage Improvements, <br /> Improvement Project#24-04. <br /> Funding Source: <br /> Estimated construction costs for this preliminary design totals $225,000 with approximately$130,000 attributable <br /> to the storm sewer system between the Monserud's property and Ford Brook, and$95,000 attributable to the <br /> storm sewer system South of 180th Lane. These costs include 10-percent contingency costs. <br /> Staff received a proposal for topographic survey of the proposed storm sewer routes from Bolton&Menk for a <br /> Not-to-Exceed amount of$3,460.00. Before finalizing plans a geotechnical report will also be required. Costs for <br /> this report are estimated at$7,000 to $10,000. <br /> Funding for this improvement is proposed to come from Storm Water Utility Funds. <br /> Recommendation: <br /> Staff recommends adopting Resolution#23-280 ordering plans and specifications for 180th Lane Drainage <br /> Improvements, Improvement Project#24-04. <br /> The City of Ramsey Public Works Committee reviewed the 180th Lane Drainage concerns during the October 17, <br /> 2023 committee meeting. The Public Works Committee unanimously recommended preparation of final plans <br /> and specifications for these improvements, including obtaining any additional topographic surveys and <br /> geotechnical explorations as necessary to complete the final design plans. <br />