My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/14/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 11/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:30:40 AM
Creation date
11/20/2023 12:02:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/14/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Van Scoy commented that as they developed the COR, the intention was to <br /> concentrate residential development to allow lesser density as you get outside the COR. <br /> Senior Planner Anderson confirmed that is an accurate statement. He noted that the subject <br /> property has been within the MUSA since the 2030 Comprehensive Plan. <br /> Commissioner Gengler asked if there would be a turn lane for the turn out for Nowthen Boulevard. <br /> Senior Planner Anderson replied that a turn lane would be required along with an acceleration <br /> lane. <br /> Commissioner Anderson invited the applicant to speak. <br /> Josh Metzer, Lennar, commented that they are excited to be looking at a new project in Ramsey. <br /> He commented that on this site they would look to introduce their heritage lineup which is a split- <br /> level product that would be new to their Ramsey developments. He commented that the home <br /> ranges from two to four bedrooms and from 1,650 to 2,050 square feet in size. He noted that most <br /> of the homes would have a three-car garage but there would be a two-car garage option as well. <br /> He stated that the price would range from $350,000 to $450,000. He provided details on the <br /> anticipated timeline if the concept is well received, noting that they would hope to submit <br /> preliminary plat before the end of the year and begin earth work in the spring with a model <br /> constructed for the fall parade of homes. He estimated a three year build out with three to four <br /> years for sale to complete. <br /> Senior Planner Anderson commented that a comment was received via email today from the <br /> property owner at the corner of 167th and Nowthen Boulevard and expressed concern with the lot <br /> size, noting that the email was provided to the Commission and will be part of the record. <br /> Commissioner Van Scoy commented that in the middle of the sketch plan there is what appears to <br /> be a blank area and asked for details. <br /> Mr. Metzer replied that would be a stormwater pond. He commented that they have not yet <br /> developed a utility and/or grading plan and therefore based it on the acreage and lots and is an <br /> example of where a pond could be located. <br /> Commissioner Van Scoy commented that seems large. <br /> Senior Planner Anderson replied that there are two different stormwater standards, infiltration and <br /> rate control. He stated that multiple departments reviewed the plan including the stormwater <br /> specialist and there were no comments that the facility would be over or undersized. He noted that <br /> when the plans become more developed, they will be able to hone in on what will be necessary to <br /> meet the requirements of the City and WMO. <br /> Commissioner Gengler asked if the deeper lots would be on the western or eastern side. <br /> Planning Commission/ September 28, 2023 <br /> Page 8 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.