Laserfiche WebLink
1 (iv) Using building materials or mitigation techniques that will blend in with the <br /> 2 natural surroundings such as green roofs, green walls, or other green and <br /> 3 brown building materials; <br /> 4 (v) Narrowing the profile of upper floors of the building; <br /> 5 (vi) Increasing the setbacks of the building from the Mississippi River or <br /> 6 blufflines; <br /> 7 (vii) Identification of techniques for preservation of those view corridors <br /> 8 identified in the MRCCA plan; and <br /> 9 (viii) Opportunities for creation or enhancement of public river corridor views. <br /> 10 (3) Structure and impervious surface placement. <br /> 11 a. Structures and impervious surface must not be placed in the shore or bluff impact zones <br /> 12 unless identified as an exemption in section 920(L). <br /> 13 b. Structures and facilities must comply with the following OHWL setback provisions <br /> 14 unless identified as exempt in section 920(L): <br /> 15 1. ROS District: 200 feet from the Mississippi River. <br /> 16 2. RN District: 100 feet from the Mississippi River. <br /> 17 C. Structures and facilities must comply with the following bluffline setback provisions <br /> 18 unless identified as exempt in section 920(L): <br /> 19 1. ROS District: 100 feet. <br /> 20 2. RN District: 40 feet. <br /> 21 3. SR District: 40 feet. <br /> 22 d. Where principal structures exist on the adjoining lots on both sides of a proposed building <br /> 23 site, the minimum setback may be altered to conform to the average of the adjoining <br /> 24 setbacks, provided that the new structure's scale and bulk riverward or bluffward of the <br /> 25 setbacks required under section 920(F)(3) consistent with adjoining development. See <br /> 26 Figure 6. <br /> Figure 6.Structure Setback Averaging <br /> Structure Setback Averaging <br /> Existing Proposed Existing <br /> Required principal t...principal. principal <br /> structure Average <br /> setback _ structure __T� � Structure i ___ structure � <br /> _ _ _ _ -- structure <br /> ....... J setback <br /> x X+Y=z Y <br /> `3 7 7, <br /> Shore <br /> Cho structul'es;fn theI Impact <br /> Zone(SIZ) <br /> OHWL <br /> The scale and bulk of a proposed principal structure <br /> must be consistent with existing principal structures. <br /> 27 <br /> 28 e. Subsurface sewage treatment systems, including the septic tank and absorption area, <br /> 29 must be located at least 75 feet from the ordinary high water level of the Mississippi <br /> 30 River and all other public waters. <br /> 31 (4) Lot size and buildable area. <br /> 32 a. The width of lots abutting the Mississippi River in the ROS District must be at least 200 <br /> 33 feet, unless alternative design methods are used that provide greater protection of the <br /> 34 riparian area. <br /> 35 b. All new lots must have adequate buildable area to comply with the setback requirements <br /> 36 of section 920(F)(3) so as to not require variances to use the lots for their intended <br /> 37 purpose. <br /> 38 (G) Performance standards for private facilities. <br /> Page 94 of 141 <br />