My WebLink
|
Help
|
About
|
Sign Out
Home
Resolution - #23-282 - 11/14/2023
Ramsey
>
Public
>
Resolutions
>
2023
>
Resolution - #23-282 - 11/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:11:30 PM
Creation date
11/20/2023 12:25:32 PM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Resolutions
Resolution or Ordinance Number
#23-282
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember Musgrove introduced the following resolution and moved for its adoption: <br /> RESOLUTION#23-282 <br /> RESOLUTION ACCEPTING STABILIZED FULL-DEPTH RECLAMATION DESIGN <br /> PROPOSAL FOR MSA ALPINE DRIVE RECONSTRUCTION, IMPROVEMENT <br /> PROJECT #24-11 <br /> WHEREAS, the City of Ramsey proposes to reconstruct MSA Alpine Drive between <br /> Puma Street and Armstrong Boulevard as identified within the 2023 — 2032 10-Year Capital <br /> Improvement Program; and <br /> WHEREAS, pursuant to Ramsey City Council Resolution 423-130, adopted June 13, <br /> 2023, the City Council accepted and awarded the proposal to Bolton & Menk, Inc., for <br /> topographic survey of the project area; and <br /> WHEREAS, pursuant to Ramsey City Council Resolution 423-129, adopted June 27, <br /> 2023, the City Council accepted and awarded the proposal to Independent Testing Technologies, <br /> Inc., for a geotechnical report of the project area; and <br /> WHEREAS, pursuant to Ramsey City Council Resolution 423-201, adopted August 22, <br /> 2023, the City Council ordered the City Engineer to prepare plans and specifications for MSA <br /> Alpine Drive Reconstruction, Improvement Project 424-11; and <br /> WHEREAS, the project is determined to require a stabilized full-depth reclamation mi <br /> design, which is beyond the ability of City Staff to perform; and <br /> WHEREAS, request for proposals were submitted to two firms for the purpose of <br /> obtaining quotes for completing the proposed stabilized full-depth reclamation mix design <br /> services; and <br /> WHEREAS, the one (1) stabilized full-depth reclamation mix design quote received is <br /> tabulated below; and <br /> STABILIZED FULL-DEPTH RECLAMATION MIX DESIGN PROPOSAL <br /> PROJECT AMERICAN ENGINEERING TESTING, INC. <br /> IP 24-11 MSA Alpine Drive Reconstruction $21,875.00 <br /> WHEREAS, the quote of American Engineering Testing, Inc. in the total amount of <br /> $21,875.00 for said services in accordance with the proposals is the lowest responsible quote and <br /> their quote shall be and hereby is accepted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.