My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/28/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 11/28/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:31:31 AM
Creation date
11/28/2023 12:18:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/28/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
701
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Municipal sewer and water do not exist in the project area, and utility extensions to the area are not proposed. The <br /> existing drainage is through a combination of swales adjacent to the roadway, and on street drainage to curb cuts <br /> in the bituminous curbing area, as well as street crossing culverts. Additionally, Staff is aware of Northern Natural <br /> gas mainlines crossing in one location at 164th Lane, approximately 600 feet east of Trunk Highway 47. <br /> Proposed Improvements <br /> Staff review of the geotechnical report found generally sandy subsoil make up the roadway embankment <br /> throughout the project area. There are areas of silt and highly plastic clay below the roadway embankment zone. <br /> These would only impact the project if excavation goes deeper than 3 to 4 feet, generally for storm sewer <br /> installation. Where these soils are found during pipe installation, the plans call for subsoil corrections in the <br /> immediate areas, and have quantities built into the plans to accommodate such a circumstance. <br /> In general,the current swales along the street within the Barthel's Rum River Acres subdivision are not proposed <br /> to be re-graded as part of this project. Due to the nature of street reconstructions,the in-slopes will be disturbed <br /> approximately 3 to 5 feet off of the edge of pavement.No changes to the current drainage patterns are proposed. <br /> The existing culverts crossing the streets are proposed to be removed and replaced,this is to ensure the culverts <br /> will last at least through the proposed 60-year design life of the street. <br /> The bituminous curbing within the White Pines Estates subdivision is proposed to be replaced with surmountable <br /> concrete curb and gutter. At driveways, a curb cut similar to what is typically placed in B-style curb will be placed <br /> to avoid a high transition from the roadway to driveways. Additionally, concrete storm sewer inlets and piping <br /> will be added to better drain the urban section streets. As discussed previously, Staff is anticipating some subsoil <br /> corrections will be necessary as part of the storm sewer construction. This will consist of removing the poor soils <br /> and replacing with select granular sand,which is proper pipe bedding material. <br /> Restoration of the impacted boulevard areas will include a minimum of 4-inches topsoil and hydroseed with a <br /> residential turf seed mix. Though the pavement is generally going back to the same location and elevation, <br /> driveway aprons will be replaced to match into the new bituminous pavement as minor changes will occur. In <br /> general, driveway aprons will be going back 8 feet to tie the driveways into the new pavement. <br /> The majority of stormwater within these subdivisions drain to a ditch located on 16512 Germanium Street. <br /> Existing there is a significant bump in the road at the culvert crossing location to this outlet,because of the lack of <br /> clearance above the pipe. This project proposes raising Germanium Street approximately 1-foot at this location to <br /> allow clearance over the new crossing pipe. This will require the driveway at 16512 to be replaced further back, <br /> and additional grading to match into the new roadway, however, work is still anticipated to be contained within <br /> the right-of-way. <br /> Preliminary Schedule Remaining <br /> •Council Approves Plans and Specifications/Authorizes Ad for Bids <br /> o November 28, 2023 <br /> • Staff Receives Bids <br /> o February 21, 2024 <br /> •Council Awards Contract to the Lowest Responsible Bidder <br /> o February 27, 2024 <br /> •Contractor Begins Construction <br /> o Spring 2024 <br /> •Contractor Substantially Completes Construction <br /> o New bituminous pavement in-place, topsoil and seed in-place <br /> o August 2, 2024 <br /> •Contractor Final Completion <br /> o Verify final restoration; punch list created <br /> o August 30, 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.