Laserfiche WebLink
Municipal sewer and water do not exist in the project area, and utility extensions to the area are not proposed. The <br /> existing drainage is through a combination of swales adjacent to the roadway, and on street drainage to curb cuts <br /> in the bituminous curbing area, as well as street crossing culverts. Additionally, Staff is aware of Northern Natural <br /> gas mainlines crossing in one location at 164th Lane, approximately 600 feet east of Trunk Highway 47. <br /> Proposed Improvements <br /> Staff review of the geotechnical report found generally sandy subsoil make up the roadway embankment <br /> throughout the project area. There are areas of silt and highly plastic clay below the roadway embankment zone. <br /> These would only impact the project if excavation goes deeper than 3 to 4 feet, generally for storm sewer <br /> installation. Where these soils are found during pipe installation, the plans call for subsoil corrections in the <br /> immediate areas, and have quantities built into the plans to accommodate such a circumstance. <br /> In general,the current swales along the street within the Barthel's Rum River Acres subdivision are not proposed <br /> to be re-graded as part of this project. Due to the nature of street reconstructions,the in-slopes will be disturbed <br /> approximately 3 to 5 feet off of the edge of pavement.No changes to the current drainage patterns are proposed. <br /> The existing culverts crossing the streets are proposed to be removed and replaced,this is to ensure the culverts <br /> will last at least through the proposed 60-year design life of the street. <br /> The bituminous curbing within the White Pines Estates subdivision is proposed to be replaced with surmountable <br /> concrete curb and gutter. At driveways, a curb cut similar to what is typically placed in B-style curb will be placed <br /> to avoid a high transition from the roadway to driveways. Additionally, concrete storm sewer inlets and piping <br /> will be added to better drain the urban section streets. As discussed previously, Staff is anticipating some subsoil <br /> corrections will be necessary as part of the storm sewer construction. This will consist of removing the poor soils <br /> and replacing with select granular sand,which is proper pipe bedding material. <br /> Restoration of the impacted boulevard areas will include a minimum of 4-inches topsoil and hydroseed with a <br /> residential turf seed mix. Though the pavement is generally going back to the same location and elevation, <br /> driveway aprons will be replaced to match into the new bituminous pavement as minor changes will occur. In <br /> general, driveway aprons will be going back 8 feet to tie the driveways into the new pavement. <br /> The majority of stormwater within these subdivisions drain to a ditch located on 16512 Germanium Street. <br /> Existing there is a significant bump in the road at the culvert crossing location to this outlet,because of the lack of <br /> clearance above the pipe. This project proposes raising Germanium Street approximately 1-foot at this location to <br /> allow clearance over the new crossing pipe. This will require the driveway at 16512 to be replaced further back, <br /> and additional grading to match into the new roadway, however, work is still anticipated to be contained within <br /> the right-of-way. <br /> Preliminary Schedule Remaining <br /> •Council Approves Plans and Specifications/Authorizes Ad for Bids <br /> o November 28, 2023 <br /> • Staff Receives Bids <br /> o February 21, 2024 <br /> •Council Awards Contract to the Lowest Responsible Bidder <br /> o February 27, 2024 <br /> •Contractor Begins Construction <br /> o Spring 2024 <br /> •Contractor Substantially Completes Construction <br /> o New bituminous pavement in-place, topsoil and seed in-place <br /> o August 2, 2024 <br /> •Contractor Final Completion <br /> o Verify final restoration; punch list created <br /> o August 30, 2024 <br />