Laserfiche WebLink
1. Adding an underground meter vault near well#8 on the existing water main in the park, including <br /> associated instrumentation for operational ease. <br /> 2. Adding a new water main between Bunker Lake Boulevard and 147th Terrace to complete the loop. The <br /> water main is anticipated to be installed on City owned property where Well No. 3 is located. Also, a new <br /> 1-inch service line is proposed to be installed off this line to the existing well house for priming the Well <br /> No. 3 pumps. <br /> 3. Re-design the water main in Town Center Drive south of Bunker Lake Boulevard and remove the water <br /> main in the open space easement to open this parcel up for future development. <br /> 4. Install a new 1-inch service line off Town Center Drive to the wellhouse building at Well No. 5 for pump <br /> priming purposes. <br /> 5. Modify the plans for the 24-inch raw water main on the trail north of Sunwood Drive to use open cut <br /> installation rather than Horizontal Directional Drilling(HDD),with the exception of under Sunwood Drive, <br /> which will still be HDD to avoid impacting the recently reconstructed street. <br /> 6. Include trenchless installation of the water main crossing Bunker Lake Boulevard at 143rd Avenue to avoid <br /> impacts to the recent improvements to Bunker Lake Boulevard. <br /> 7. The trunk water main under 143rd Avenue will now be fully installed via open cut trench installation <br /> followed up with full depth bituminous pavement replacement due to the age and condition of the existing <br /> pavement, and to avoid reconstructing one side of the street and overlaying the other,putting the two sides <br /> of the street on different maintenance schedules. To accommodate the construction traffic using 143rd <br /> Avenue for the WTP construction and to maintain access to adjacent commercial/industrial properties, <br /> phased pavement removal is anticipated to maintain a hard driving surface to the greatest extent possible <br /> during construction. <br /> On September 26, 2023,the Ramsey City Council adopted Resolution#23-237 approving revised final plans and <br /> specifications as prepared by SEH, Inc. and authorizing advertisements for bids including a base bid and an <br /> alternate bid utilizing prevailing wage rates. <br /> Final construction plans and specifications as bid are attached for reference. <br /> Notification: <br /> Bids were advertised in Finance and Commerce and in the Anoka Union Herald on Friday, September 29, and on <br /> Friday, October 6, 2023. Bids were also advertised and managed online on QuestCDN. <br /> Time Frame/Observations/Alternatives: <br /> Observations: <br /> A total of seven(7)bids were received, opened and tabulated by SEH, Inc. on November 1,2023, and the <br /> following bids were found to comply with the approved plans and specifications and advertisements for bids. <br /> TOTAL ALTERNATE <br /> CONTRACTOR TOTAL BASE BID BID <br />