My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 12/14/2023
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2023
>
Agenda - Parks and Recreation Commission - 12/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:37:43 AM
Creation date
12/8/2023 3:42:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
12/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL SPECIFICATIONS <br /> To remove 14 wooden decks and replace with treated wood and <br /> prepare the surface of 42 square posts—and subsequently stain all wood. <br /> I/We agree to furnish all labor, wood and supplemental materials as needed, and site <br /> security to perform the work below. <br /> • Mobilization and material handling and fitting necessary to remove and replace <br /> 14 wood decks, that are approximately 40" square, comprised of treated wood, <br /> approximately 2'A thick. <br /> • Contractor responsible for viewing the project, to review the scope of work, and <br /> confirm measurements and materials as needed. <br /> • Contractor shall also supply and install 13 square post caps, matching green in <br /> color. <br /> • Contractor may address project specific questions or request a meeting on site by <br /> contacting Parks & Asst. Public Works Director, Mark Riverblood @ <br /> mriverblood@cityoframsey.com <br /> • Additional detail and incidental work are specified below. <br /> • This Request for Quotation shall be a not-to-exceed amount. The Contractor must <br /> include within his/her quote any time or materials necessary to complete the work <br /> in a professional and quality manner. There will be no Change Orders. <br /> • Work site may be required to be enclosed with temporary safety fencing—if the <br /> contractor is not physically on site. Fencing is not required if there are no <br /> equipment or loose items/tools anywhere on site, and all play equipment is <br /> completely safe for public use. Wet Paint signs are to be placed on the equipment if the <br /> stain is not dry, and fencing is not up. <br /> 21Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.