Laserfiche WebLink
11/17/2023 02:24 PM <br /> Type: Action <br /> State: For Discussion <br /> Revise storm sewer routing to utilize existing stub. There is not wall space to add connection as <br /> proposed into existing catchbasin. <br /> --------- 0 Replies--------- <br /> 5 - Identify circle <br /> Status as of 11/16/2023 12:56 PM <br /> Type: Action <br /> State: For Discussion <br /> Created by: Len Linton <br /> On: 11/16/2023 12:56 PM <br /> Type: Action <br /> State: For Discussion <br /> This appears to be a drafting aid. Remove circle from plan. <br /> --------- 0 Replies--------- <br /> 6 - Cleanouts <br /> Status as of 11/16/2023 12:58 PM <br /> Type: Action <br /> State: For Discussion <br /> Created by: Len Linton <br /> On: 11/16/2023 12:58 PM <br /> Type: Action <br /> State: For Discussion <br /> A cleanout is required upstream of every bend in PVC pipes. Simplify storm sewer layout to <br /> remove bends. <br /> --------- 0 Replies--------- <br /> Page 2 <br />