Laserfiche WebLink
PROPOSAL SPECIFICATIONS <br />Remove and recycle existing play equipment and associated appurtenances <br />and design and install new playground appropriate for a community park. <br />Prequalificatiori s: <br />I. Bidder/Contactor shall demonstrate that he/she has successfully installed 3 (three) <br />similar playgrounds in a county, municipal or school setting in the Twin Cities <br />Metropolitan area within the last 5 (five) years. <br />II. Bidder/Contractor shall not be disbarred or disqualified from working on <br />playground related construction projects by any municipality, county or school <br />districts in the State of Minnesota. <br />Introduction and General Information: <br />• In submitting a proposal, the Contractor warrants that mobilization and material <br />handling necessary to install ALL play equipment and improvements as proposed <br />is wholly included in their proposal. <br />• Contractor responsible for viewing the existing site, to review the scope of <br />removals, and infrastructure to remain and protect. <br />• There are no known underground obstructions (E.g. abandoned footings, utilities) <br />at the park location. <br />• This Request for Proposal shall be a not -to -exceed amount. The Contractor must <br />include within his/her quote any time or materials necessary to complete the work <br />in a professional and quality manner. E.g. if matting is required due to wet <br />conditions or to protect trail surfaces and tree rooting zones — this expense is that <br />of the Contractor. There will be no Change Orders. <br />• Work site may be required to be enclosed with temporary safety fencing —if the <br />contractor is not physically on site. Fencing is not required if there are no <br />equipment or loose items/tools anywhere on site, aside from loose major play <br />components that do not constitute a hazard, and/or plywood/ work mats (if <br />used), which may be present until job completion. <br />21F1arri <br />