My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 01/11/2024
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2024
>
Agenda - Parks and Recreation Commission - 01/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:34:47 AM
Creation date
1/11/2024 1:18:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
01/11/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work and Staging Areas: <br />Confine work activities to the playground area and a direct route from the parking lot, <br />to that necessary to remove and install play equipment components. No mechanized <br />equipment shall be left overnight at the park (unless fenced), and no construction <br />activity shall be performed before 7 AM nor after 7 PM Monday through Saturday. The <br />contractor shall provide 72 hour advance notice before working on Saturday. City <br />Council approval is required for Sunday work. <br />A dumpster is not anticipated to be needed on site, and no construction related disposal <br />is to be placed in the trash receptacle at the park. Contractor may dispose of any <br />playground remnants in the dumpster at Public Works,14199 Jaspar Street. <br />Liquidated Damages: <br />Liquidated damages shall be deducted from the approved quoted amount, in a sum of <br />$30 dollars per weekday (M-F) for non -completion after April 30th, 2024. <br />Warranty/Guarantee: <br />The Contractor warrants and guarantees to the Owner that all installation Work will be <br />of good quality and free from faults or defects in accordance with this RFQ. All <br />defective Work may be rejected. <br />If required by the Owner, prior to payment, the Contractor will promptly without cost to <br />the Owner, correct defective Work, or replace it with non -defective Work. If the <br />Contractor does not correct such defective Work or remove and replace within a <br />reasonable time, the Owner may have the deficiency corrected or the rejected Work <br />removed and replaced. All direct or indirect costs of such correction or removal and <br />replacement, including compensation for additional professional services shall be paid <br />by the Contractor, or deducted by the Owner, all such costs from the quoted contract <br />price. <br />If, instead of requiring correction or removal and replacement of defective Work, the <br />Owner (prior to approval of final payment) prefers to accept it, they may do so. In such <br />case, if the acceptance occurs prior to final payment, a Statement shall be issued <br />incorporating the necessary revisions, including appropriate reductions in Contract <br />Price. <br />4 1 II ! a g ii,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.