Laserfiche WebLink
St. Frands Boulevard Trail <br />ALL OFF -ROAD TRAIL <br />Length/Area Unit Price Cost <br />Base TrM 1,000 $56M $56,000-00 <br />Special Slope Areas 100 $12.0,M $12,01100.00 South end, lincludes utflity and culvert conflicts. <br />Vrig,ation and Tree Conflicts, 200, $601.00 $12,000.00 Aflowance for tree relocation and irrigatibn repairs. <br />Subtil $80"000.00 <br />Moblildation <br />810% <br />Traff nc Contro$ <br />3.0% $2,400.00 <br />Total Construction Estimate <br />$88,800.00 <br />Le rig, th <br />1,000 <br />Cost perLF Check <br />$88,80 <br />Administrative (Low) <br />$13,3.2D.00 15-percent ifor a locafly funded trail <br />Ad ministr,-ative (High) <br />$22,200.00 25-ipercent for a federally funded trail <br />Estimated Total Project Cost Range <br />$10,2,120 to %1 11,0010 <br />Oty rA Ran,r&ey jp,aircef at southi end, Rol easernent fin 01k, jpr4eirty priat to &'a[je <br />Nered traill easements cl parcleAr, irrurlh of City proWM:V. 93,0 feet of Wngth K 20 fleet wide <br />15ase Trai 11 Cast � ' 45,/L F, iricludes gradiinig, CLS, bituminojus, restoraflon, seedinp <br />Retaining ,,, vvaltk�; Assurne S25/Vabove grounid (exfxm;ed siurface), <br />Tree cteming and ti'mminiiin,&$ 10001a"M"r <br />Dow'dwallk or bridjge;� 52W/LF <br />Culiverl <br />Din Road $ 1 SAF for ar, ipirhg airwcs slIgnage and c ro.", waJ L., <br />C urband Gut t er, : $1 00/1J, i nd udfes blittjmiftou s pat th ng in front ol curb and dr a 1: nalge pipe a r wild st r uc I t,j re.,5 <br />Wettand Replaconern: $50,0010/lAcre <br />mubi&'afiom 8% <br />Traffic l 311% <br />