My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 01/11/2024
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2024
>
Agenda - Parks and Recreation Commission - 01/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:34:47 AM
Creation date
1/11/2024 1:18:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
01/11/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />• Ili '" * "' « <br />Quotation <br />Project: Alpine Park - Scope A - City of Ramsey Phone: 763-433-9820 <br />Contact: MariahAlbrecht Fax: <br />Strip To: 6600Alpine Dtive NW <br />Ramsey, MN 55303 <br />133lineor ft <br />sr:,. t•Ti'•%iilLtr+��t , 5a r i s *; � t. <br />0 <br />Date: 1/8/24 <br />M r• Total <br />a a PlayworldPlaygroundD. <br />*Price includes all play egtlipment. Poured-in•Place, <br />and Engineered W ood Fiber as shown on design <br />#MWOI0524-1 <br />6" x 12" Concrete Curb Border <br />Discount $ (15,27200) <br />Freight $ 3,50,00 <br />* Please provide certificate SolesTax <br />iocat SalesTox <br />Total S 87 227.00 <br />options <br />Add $12,773 for instatation of oli play equipment and safety surfacing shown In design #MW01O524.1, and <br />all site prep Including removal and disposal of existing play equipment and safety surfacing. <br />NOTE; Any Insurance requirements above $1,000,000 General I.IabWty will be subject to a surcharge <br />NOTE r)NrdrM OTMVVISri NOTED, prices shown are material only. They 00 NOT include: assembly, installation, border, safety surfacing, <br />drain tile, geotextile fabric, removal of existing equipment site preparation, excavation or site restoration, unloading of equipment, disposal of <br />packaging material, storage of equipment, additional insurance and bonding would be extra, unless otherwise stated above. if playground <br />equipment or materials are stared off site, customer is responsible tot transporting equipment to jab site. <br />Prices firm frrrM days, sub(eet to review thereafter; Our terms arc net ail A finance charge ofl,J% wi)l be imposed on the ountandon bolimce unpaid <br />for more than 30 days after the shipment ofmaterlab. Equipment shall be invoiced seperaiely from otherservices and shall be payable In advance <br />ofthose services andprolect completion. )%tamage not acceptedOnce eusiomerhas signed quotation, your order cannot be changed or concetedPleare <br />allow TBDweeks for delivery oferreceipt oforder. Standard maratfacturmRdcs&n,specificatkAandconstructionapply unless noted otherwle, clurromer <br />it responsible for the kkn0wation and marbling ofall undeigrenmdurdwes (public or private) to include dram file andsprinkler systems. Area must be <br />accessible to Bobcat and other equipment necessary for tnriaRation or addMnal fees will be charged Freight quote is based on customer unloodmg <br />equipment and checking in all equipment for any meis#W paris. Ifrrowhic?is reliised by customer upon delivery for any reason (unless damaged), <br />wtthoutprwr atdhorda On from MidgwstPlayscape.r, Inc., the customer agrees to pap 20'i* restocking fee plus freight charges, <br />Price aloes not meduie pro vailmz wagws, unless otherwise noted Ifwe can be of0therAmisio7we, please feet free to contactus. <br />Signed: 11. Y)s� Accepted <br />Dominic Dvorok Date: <br />Printed Norm: <br />°° 1 1 M <br />
The URL can be used to link to this page
Your browser does not support the video tag.