Laserfiche WebLink
2024 Cost Estimates <br />Base Trail <br />Length/Area Unit Price <br />1000 $56.00 <br />Cost <br />$56,000.00 Holiday to 142nd Ave <br />Special Slope Areas 100 $120.00 $12,000.00 South end, includes <br />utility and <br />culvert conflicts. <br />Irrigation and Tree Conflicts 200 $60.00 $12,000.00 Allowance for tree <br />relocation and <br />irrigation repairs. <br />Subtotal $80,000.00 <br />Mobilization <br />8.0% $6,400.00 <br />Traffic Control <br />3.0% $2,400.00 <br />Total Construction Estimate <br />$88f8OO.00 <br />Length <br />1,000 <br />Cost per LF check <br />$88.80 <br />Administrative (Low) <br />$13f320.00 <br />15-percent for a <br />locally funded trail <br />Administrative (High) <br />$22,200.00 <br />25-percent for a <br />federally funded trail <br />Estimated Total Project Cost Range $102,120 to $111,000 <br />