Laserfiche WebLink
5. 6. <br />Public Works Committee <br />Meeting Date: 01/16/2024 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Consider Recommending City Council Approving Plans and Specifications and Authorizing Advertisement for <br />Bids for Juniper Woods 1st — 3 rd Street Reconstructions, Improvement Project #24-12 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider recommending City Council approving plans and specifications and <br />authorizing advertisement for bids for Juniper Woods 1st — 3 rd Street Reconstructions, Improvement Project <br />#24-12. <br />Background: <br />City Improvement Project #24-12 proposes to reconstruct the streets within the Juniper Woods 1 sty 2nd, and 3 rd <br />subdivision, generally located south of Alpine Drive between Tonto Street and Ute Street. The 2024 — 2033 <br />Capital Improvement Plan (CIP) identifies these streets for reconstruction in 2024. Street segment summaries are <br />attached to this case. <br />Existing Conditions <br />The streets are 31-foot wide urban section with concrete curb and gutter, totaling 0.75 miles in length. Traffic <br />counts have not been taken, but Staff anticipates typical neighborhood traffic levels due to the location of the <br />subdivision and lack of destinations in the area. <br />The existing pavement section is approximately 2.3-inches of bituminous over 4.3-inches aggregate base, for an <br />average total section thickness of 6.6-inches. <br />Sanitary sewer, watermain, and storm sewer exist within the project area. During the summer of 2023, watermain <br />leak testing was performed across the City. No issues were found within this subdivision. As part of preliminary <br />design, televising of the sanitary and storm sewers was performed. No issues were found with the sanitary sewer. <br />During review of the storm sewer, a broken pipe and a large root ball where discovered. This occurred on the <br />storm sewer pipe which carries back yard drainage between the properties at 15190 and 15200 Ute Street. <br />Replacing the pipe will require removal of at least one tree, and require the properties owners to move the chain <br />link fence which runs over the pipe. All work is proposed to occur within drainage & utility easement, and the <br />fence will be allowed to be replaced after the storm sewer work is complete. Staff is coordinating moving the <br />fence with the property owners. There are two other short runs of pipe which will require replacement, but occur <br />under the street. <br />Pro] ect History <br />• 2024 — 2033 Capital Improvement Program — listed as street reconstruction for 2024. <br />. June 13, 2023, Resolution #23-130 the Ramsey City Council accepted proposals for topographic survey of <br />the project area. <br />• June 27, 2023, Resolution #23-129 the Ramsey City Council accepted proposals for geotechnical report of <br />the project area. <br />• August 22, 2023, Resolution #23-202 the Ramsey City Council ordered Staff to prepare plans and <br />specifications. <br />