My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 01/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:45:52 AM
Creation date
1/16/2024 3:01:52 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL EXPLORATIONS <br />CITY PROJECT 24-12 <br />JUNIPER WOODS 1-3 STREET IMPROVEMENTS <br />RAMSEY, MINNESOTA <br />PROJECT 23-192 <br />A. Introduction <br />This report is being prepared for use by our client on this specific project. We intend to present this <br />report and our findings in the same logical manner that led us to arrive at our recommendations. <br />This report is based on some general assumptions regarding the anticipated construction based on <br />experience with similar projects. These assumptions and the entire report should be reviewed <br />immediately upon receipt. <br />Purpose: <br />The purpose of our investigation was to evaluate the existing soil and water conditions on this site <br />for the purpose of reconstructing the existing roadway. The project will consist of reconstruction of <br />Ute Street NE and Tonto Street NE south of Alpine Drive NE in Ramsey, Minnesota. The streets <br />will be reconstructed to an urban section with concrete curb and gutter. In accordance with your <br />written authorization, we have conducted a subsurface exploration program for the proposed <br />project. <br />Scope of Services: <br />Our authorized scope of services included the following: <br />1. To core the pavement at ten (10) locations to determine the existing pavement <br />thickness. <br />2. To investigate the subsurface soil and water conditions encountered at those same <br />ten (10) locations using split spoon sampling. The borings were planned to depths <br />of just under fifteen (15) feet to eighteen (18) feet at each location. <br />3. To provide a report of our findings including a summary of our findings with <br />pavement thickness at each boring location as well as recommendations regarding <br />earthwork, fill and compaction, subgrade preparation, and pavement design with <br />an estimated design R-value. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.