Laserfiche WebLink
5. 20. <br /> CC Regular Session <br /> Meeting Date: 01/23/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Information <br /> Title <br /> Adopt Resolution#24-042 Approving Plans and Specifications and Authorizing Advertisement for Bids for <br /> Juniper Woods 1st—3 rd Street Reconstructions, Improvement Project#24-12 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to Adopt Resolution#24-042 approving plans and specifications and authorizing <br /> advertisement for bids for Juniper Woods 1 st—3 rd Street Reconstructions, Improvement Project#24-12. <br /> Background: <br /> City Improvement Project#24-12 proposes to reconstruct the streets within the Juniper Woods Ist,2nd and 3rd <br /> subdivision, generally located south of Alpine Drive between Tonto Street and Ute Street. The 2024—2033 <br /> Capital Improvement Plan(CIP)identifies these streets for reconstruction in 2024. Street segment summaries are <br /> attached to this case. <br /> Existing Conditions <br /> The streets are 31-foot wide urban section with concrete curb and gutter, totaling 0.75 miles in length. Traffic <br /> counts have not been taken,but Staff anticipates typical neighborhood traffic levels due to the location of the <br /> subdivision and lack of destinations in the area. <br /> The existing pavement section is approximately 2.3-inches of bituminous over 4.3-inches aggregate base, for an <br /> average total section thickness of 6.6-inches. <br /> Sanitary sewer,watermain and storm sewer exist within the project area. During the summer of 2023,watermain <br /> leak testing was performed across the City, no issues were found within this subdivision. As part of preliminary <br /> design, televising of the sanitary and storm sewers was performed. No issues were found with the sanitary sewer. <br /> During review of the storm sewer, a broken pipe and a large root ball where discovered. This occurred on the <br /> storm sewer pipe which carries backyard drainage between the properties at 15190 and 15200 Ute Street. <br /> Replacing the pipe will require removal of at least one tree, and require the properties owners to move the chain <br /> link fence which runs over the pipe. All work is proposed to occur within drainage &utility easement, and the <br /> fence will be allowed to be replaced after the storm sewer work is complete. Staff is coordinating moving the <br /> fence with the property owners. There are two other short runs of pipe which will require replacement,but occur <br /> under the street. <br /> Project History <br /> •2024—2033 Capital Improvement Program—listed as street reconstruction for 2024. <br /> .June 13, 2023,Resolution#23-130 the Ramsey City Council accepted proposals for topographic survey of <br /> the project area. <br /> •June 27, 2023, Resolution#23-129 the Ramsey City Council accepted proposals for geotechnical report of <br /> the project area. <br /> •August 22,2023,Resolution#23-202 the Ramsey City Council ordered Staff to prepare plans and <br /> specifications. <br />